BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 13, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a mixed-use development in Vidalia, Georgia. Completed plans call for site work for a playground / park / athletic field.

Design professionals are requested to provide a conceptual tree staking plan that identifies species, whether each plant is evergreen or deciduous, plant spacing, quantity (with a planting schedule), and a minimum proposed size of 2.5" caliper. The design must account for overhead utilities, existing drives, and entrances for aesthetics. If 250 trees exceed the primary area, Ed Smith Park should be included. Install trees in right-of-ways with mulch or pine straw, stake each tree with three stakes, and remove any existing trees hindering the project (coordinate with the city before removing shrubs or trees). Trees on Center Drive are to be placed on the eastern side between sidewalk and curb; on McIntosh, on the western side. Provide a watering solution for four months in areas without irrigation. Proposal pricing must include the total installed design, mulch, removal, watering, and staking. List a separate price for annual maintenance, including pruning and mulch replacement as needed. Proposals must describe qualifications, experience, three to five relevant references, and job history. All design professionals must be appropriately insured. The City's goal is to begin this project prior to July 4, 2026, with work progressing toward final completion on or before July 4, 2026; OR, the City is willing to start the project on July 4th and continue to it's completion.

Post-Bid

Playgrounds / Parks / Athletic Fields

$300,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
46
Bidding Soon
649
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2026

July 4, 2026

Project location map

Multiple Locations, Vidalia, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.