Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 1, 2026 at 8:00 PM
Updated April 2, 2026
Site work for a water / sewer project in Greensboro, Alabama. Completed plans call for site work for a water / sewer project.
The work involves providing labor, equipment, and material for the Proposed Greensboro Water System Critical Needs Infrastructure Improvements Project ~ Phase II / Greensboro Valve Replacement Project - DWSRF PROJECT NO. FS010340-01. The principal item of work is to remove and replace isolation valves. The successful bidder must furnish a Performance Bond and a Payment Bond, each for one hundred percent of the bid amount, and secure these bonds from a bonding company's representative or agent in the State of Alabama. No bid may be withdrawn after the opening time, and the Owner may hold bids for sixty days. The contract duration is 30 consecutive calendar days, and liquidated damages will be assessed if this time is exceeded. All applicable federal guidelines must be met as funds for this project are provided through Drinking Water State Revolving Funds. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received less than ten days prior to the date for opening of Bids may not be answered.
Bid Results
Water / Sewer
$27,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 24, 2026
April 23, 2026
Hobson St, Greensboro, AL
Related To This Project
Greensboro, AL
Bid Date: May 19 2026
Greensboro, AL
Bid Date: May 28 2026
Greensboro, AL
Bid Date: Jun 10 2026
Greensboro, AL
Bid Date: Mar 24 2026
Greensboro, AL
Bid Date: Oct 30 2025
Greensboro, AL
Bid Date: Sep 09 2025
Greensboro, AL
Bid Date: Sep 09 2025
Greensboro, AL
--
Greensboro, AL
Bid Date: Mar 21 2025
Greensboro, AL
Bid Date: Feb 18 2025
Greensboro, AL
Bid Date: Dec 10 2024
Greensboro, AL
Bid Date: Nov 19 2024
Greensboro, AL
Bid Date: Nov 14 2024
Greensboro, AL
Bid Date: Oct 15 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
