BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 17, 2026 at 8:00 PM

Updated May 21, 2026

Renovation of a military facility in Harrison Township, Michigan. Working plans call for the renovation of a military facility.

The work shall be performed in strict compliance with the Statement of Work, project specifications, and project drawings. Where sections of the SOW supersede the specifications, the more stringent or higher quality requirements shall apply. The contractor shall schedule and perform construction tasks for the replacement of the existing heating boiler systems and rooftop units in Building 164, providing complete, fully operable boiler and RTU systems. All labor, materials, equipment, and services necessary to deliver functional and operational systems shall be furnished in accordance with the requirements identified in the pre-solicitation attachments. The magnitude of construction is between $500,000.00 and $10,000,000.00. The contract duration will be 424 calendar days after notice to proceed to include site restoration. All questions for the pre-bid conference must be submitted by 1 May 2026 via email to david.brown.39@us.af.mil and anna.randall.1@us.af.mil The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Military

$10,000,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
414
Active Projects
247
Bidding Soon
2,987
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2026

Project location map

To Be Determined, Harrison Township, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.