Site work, new construction and renovation of an educational facility in Chico, California. Completed plans call for the construction of a educational facility; and educational facility.

** As of April 9,2026 , this project has not yet been awarded. The project is expected to be awarded on April 15,2026.** All required labor, material, equipment, and services for the Citrus Elementary School Modernization & New Construction, for the Chico Unified School District in strict conformity with the Drawings, Specifications and Contract Documents. All bids shall be on the forms provided by the District. Each bid must conform and be responsive to all pertinent bid and Contract Documents, including, but not limited to, the Instructions to Bidders. Pre-qualification requirements: The Bidder is required to have been prequalified by the District prior to submitting its bid. If the Project has electrical, mechanical, or plumbing components to be performed by subcontractors with the following license classification(s): C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, and/or C-46, those subcontractors are also required to have been prequalified by the District. The Bidder is required to possess one or more of the following State of California Contractor Licenses: B. The Bidder's license(s) must be active and in good standing at the time of the bid opening and remain so throughout the term of the Contract. Bidders and subcontractors must comply with registration and qualification requirements pursuant to Labor Code 1725.5 & 1771.1. A mandatory pre-bid conference and site visit is required. Each Bidder shall provide bid security with its bid form in the amount of ten percent (10%) of the total bid price. The successful Bidder will be required to furnish a 100% Performance Bond and a 100% Payment Bond if awarded the contract. All workers must be paid not less than the prevailing wage rate for the type of work performed in the locality of the project as determined by the State of California. All questions about the meaning or intent of the Contract Documents are to be directed in writing to the District, at ktiner@chicousd.org Questions received less than SEVEN (7) calendar days prior to the date for opening Bids may not be answered Phase 1 Contractor mobilization and start through completion of the TK/K building, including all associated site work and playground. April 20, 2026 - July 3, 2027 Phase 1B All Phase 1 work per the phasing plan, including site demolition, new utilities, underground infrastructure for electrical, Comcast, and PG&E services, exterior concrete, site work for the proposed water hydrant, and interior modernization of the lobby, restrooms, electrical room, and office spaces. June 4, 2026 -August 7, 2026 Phase 2 Completion of all Phase 2 work per the phasing plan, including Building A interior work, HVAC replacement, track and field, and playgrounds. June 7, 2027 - August 4, 2027

Bid Results

Educational

$12,150,000.00

Public - City

New Construction, Renovation, Site Work

9

8

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
57
Bidding Soon
567
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 7, 2026

April 20, 2026

Project location map

1350 Citrus Ave, Chico, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.