Black Friday through Cyber Monday: Get 10% off Project Intelligence

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 24, 2026 at 7:00 PM

Updated November 27, 2026

Renovation of a stadium in Sutton West, Ontario. Completed plans call for the renovation of a stadium.

Georgina Sutton Arena. Scope to include: energy efficiency retrofits and replacements and BAS upgrades. Replace 23 plumbing fixtures; replace 2 water heaters; replace 1 furnace; add DCV CO2 sensors to 2 RTUs; replace 2 refrigeration compressor packages; install standby cold floor glycol pump; replace refrigeration starters and controls; replace interior and exterior fluorescent/HID lighting with LED fixtures; replace emergency and exit lights; implement Facility Automation Control System (FACS/BAS); integrate refrigeration plant, boilers, lighting, HVAC, domestic hot water and space heaters. Documents can be obtained at https://www.bidsandtenders.com/bid-opportunities/ Question Deadline 11/17/2026 at 2:00 PM ET The Corporation of the Town of Georgina (Town) is seeking bid submissions from experienced and qualified Technical Standards and Safety Authority (TSSA Licensed) vendors (respondent) to supply all labour, equipment, material , and supervision necessary to complete the Energy Efficiency Retrofits and new Building Automation System (BAS) installation as per the attached Engineering drawings and technical specifications (work)

Sub-Bidding

Arenas / Stadiums

$480,000.00

Public - Federal

Renovation

14

9

2

3

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
433
Active Projects
221
Bidding Soon
3,530
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 30, 2026

December 15, 2026

Project location map

48 Hawkins St, Sutton West, ON

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed