Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 13, 2026 at 8:00 PM
Updated May 20, 2026
Site work for a civil project in Falher, Alberta. Completed plans call for site work for a bridge / tunnel; and water / sewer project.
Culvert replacement and other work. Bridge File 86366, SW 14-78-21-W5M carrying a local road over the Desilet Drainage, 5 km NW of Falher. Work at this site includes the removal and disposal of the existing 2 - 2159 mm x 1473 mm arch CSP culvert structures with 18 m invert lengths and the installation of a 2 - 2700 mm CSP culvert structures with a 29.00 m invert length. The crossing is located on Township Road 782 over the Desilet Drainage Channel, 5 km northwest of Fahler. A location plan has been included in the Plans section of this document for the Contractor's convenience. Without limiting the provisions of these Specifications and Contract, the Scope of Work at this site shall include the following: - Traffic Accommodation - Demolition and Disposal of Existing Structure - Excavation - CSP Supply - CSP Assembly - Backfill - Roadway Work - Supply and Placement of Class 1 Heavy Rock Riprap - Supply and Installation of Erosion Control Soil Covering (Type C) - Supply and Installation of Erosion Control Barrier (Straw Fibre Roll) - Supply and Installation of Erosion Control Barrier (Silt Fence)
Bid Results
Bridges / Tunnels
$306,600.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 10, 2026
June 1, 2026
SW 14-78-21-W5M, Falher, AB
Related To This Project
Falher, AB
Bid Date: Apr 10 2026
Falher, AB
Bid Date: May 01 2026
Falher, AB
Bid Date: Aug 12 2025
Falher, AB
Bid Date: Jul 22 2025
Falher, AB
Bid Date: Apr 10 2025
Falher, AB
--
Falher, AB
Bid Date: Mar 04 2025
Falher, AB
Bid Date: Mar 05 2025
Falher, AB
Bid Date: Sep 04 2024
Falher, AB
Bid Date: Nov 04 2025
Falher, AB
Bid Date: Apr 18 2024
Falher, AB
Bid Date: Mar 20 2024
Falher, AB
Bid Date: Jan 03 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
