BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 9, 2026 at 8:00 PM

Updated May 16, 2026

Site work and paving for a civil project in Winona, Minnesota. Completed plans call for site work for a bridge / tunnel; road / highway; and for paving for a road / highway.

STATE AID PROJECT 085-637-030 SAP 085-604-002 SAP 085-605-023 & 085-612-034 SAP 085-637-030 SAP 085-639-025 CRs 4, 5 & 12, 37 and 39 BITUMINOUS RECLAMATION, MILLING & OVERLAY WITH CULVERT IMPROVEMENTS BITUMINOUS RECLAMATION, MILLING & RESURFACING WITH CULVERT REPLACEMENTS, REPAIRS, PLUG & FILL & LINING Including Bituminous Surfacing, Miscellaneous Removals, Excavation, Culverts and Aprons, Culvert Cleaning, Culvert Filling and Plugging and Culvert Lining, Random Riprap, Traffic Control, Erosion Control, Turf Establishment and Striping. Estimated Quantities of Work Cr 4 Mobilization - 1 Ls; Remove Pipe Apron - 2 Each; Salvage Fence - 50 Lf; Aggregate Surfacing Class 1 & Base Class 5 - 744 Ton; Dozer - 2 Hour; Full Depth Reclamation - 5305 Sy; Type Sp 12.5 Wearing Course Mixture (2,c) - 1526 Ton; Pavement Density Incentive - 1 Ls; Granular Foundation &/or Bedding - 9 Ton; 18" & 24" Cs Pipe Aprons - 4 Each; 18" Cs Pipe Culvert - 4 Lf; Clean Pipe Culvert - 45 Lf; Random Riprap Class Iii - 17 Cy; Traffic Control - 1 Ls; Sediment Control Log Type Wood Chip - 45 Lf; Turf Establishment - 1 Ls; Rolled Erosion Prevention Category 25 - 79 Sy; 4" Solid & Double Solid Line Paint - 5704 Lf; and Miscellaneous and Appurtenant Items Required for a Complete Project. Cr 5 & 12 Mobilization - 1 Ls; Remove Casting - 1 Each; Salvage Casting - 1 Each; Salvage Concrete Apron - 7 Each; Remove Curb & Gutter - 37 Lf; Salvage Concrete Pipe Culvert - 36 Lf; Aggregate Surfacing Class 1 - 415 Ton; Dozer - 3 Hour; Full Depth Reclamation - 19408 Sy; Mill Bituminous Surface - 33 Sy; Mill Bituminous Surface (2.0") - 27693 Sy; Type Sp 12.5 Wearing Course Mixture (2,c) & (2,b) - 7,585 Ton; Pavement Density Incentive - 1 Ls; Granular Backfill & Foundation &/or Bedding - 140 Ton; Install Concrete Culvert - 36 Lf; Install Concrete Apron - 7 Each; Casting Assembly - 1 Each; Install Casting - 1 Each; Grout Catch Basin or Manhole - 6 Each; Clean Out Catch Basin - 10 Each; Random Riprap Class Iii - 24 Cy; Concrete Curb & Gutter Design B624; 37 Lf; Traffic Control - 1 Ls; Storm Drain Inlet Protection - 4 Each; Sediment Control Log Type Wood Chip - 433 Lf; Turf Establishment - 1 Ls; Rolled Erosion Prevention Category 25 - 444 Sy; 4" Solid, Double Solid & Broken Line Paint - 39,365 Lf; and Miscellaneous and Appurtenant Items Required for a Complete Project. Cr 37 Mobilization - 1 Ls; Remove Pipe Culverts - 82 Lf; Excavation (Common) - 120 Cy; Geotextile Fabric Type 5 - 280 Sy; Aggregate Surfacing Class 1, Base Class 5 & Base Class 5q Mod - 2430 Ton; Dozer - 9 Hour; Full Depth Reclamation - 42986 Sy; Mill Bituminous Surface - 101 Sy; Type Sp 12.5 Wearing Course Mixture (2,c) - 10030 Ton; Pavement Density Incentive - 1 Ls; Pavement Smoothness Incentive - 51 Segs; Granular Backfill & Foundation &/or Bedding - 2473 Ton; 24" Cs Culvert Apron - 1 Each; Plug Fill & Abandon Pipe Culvert - 1 Each; Clean Pipe Culvert - 332 Lf; 24" Pipe Culvert - 80 Lf; Install Manhole - 1 Each; Lining Culvert Pipe 24" & 36" - 276 Lf; Random Riprap Class Iii - 20 Cy; Traffic Control - 1 Ls; Storm Drain Inlet Protection - 1 Each; Sediment Control Log Type Wood Chip - 788 Lf; Turf Establishment - 1 Ls; Rolled Erosion Prevention Category 25 - 925 Sy; 4" Solid, Double Solid & Broken Line Paint - 38,846 Lf; and Miscellaneous and Appurtenant Items Required for a Complete Project. Cr 39 Mobilization - 1 Ls; Remove Pipe Culverts - 65 Lf; Excavation (Common) - 54 Cy; Geotextile Fabric Type 5 - 114 Sy; Aggregate Surfacing Class 1, Base Class 5 & Base Class 5q Mod - 448 Ton; Dozer - 1 Hour; Full Depth Reclamation - 8157 Sy; Mill Bituminous Surface - 45 Sy; Type Sp 12.5 Wearing Course Mixture (2,c) - 1926 Ton; Pavement Density Incentive - 1 Ls; Pavement Smoothness Incentive - 10 Segs; Granular Backfill & Foundation &/or Bedding - 246 Ton; 30" Cs Culvert Apron - 1 Each; 30" Pipe Culvert - 60 Lf; Random Riprap Class Iii - 13 Cy; Traffic Control - 1 Ls; Sediment Control Log Type Wood Chip - 212 Lf; Turf Establishment - 1 Ls; Rolled Erosion Prevention Category 25 - 233 Sy; 4" Solid, Double Solid & Broken Line Paint - 7300 Lf; and Miscellaneous and Appurtenant Items Required for a Complete Project.

Award

Roads / Highways

$2,978,156.00

Public - County

Paving, Site Work

76

6

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
75
Bidding Soon
743
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 13, 2026

June 12, 2026

Project location map

Multiple Locations, Winona, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.