Site work and renovation of a detention facility in Fox Lake, Wisconsin. Completed plans call for the renovation of a detention facility; and for site work for a detention facility.

In general, the work consists of: the replacement of the existing elevated walkway at the BSI/Vocational Building at the Fox Lake Correctional Institute. The current walkway is a fully exposed concrete slab and beam system approximately 528 ft in length by 12 feet wide and has a concrete stair on either end that will also be replaced. The walkway will be replaced with a new precast slab structure with a concrete topping which will be designed to provide a waterproofed system to protect the precast. A traffic membrane will be added to the top surface to protect the topping. At the lower level, all the roll-up doors will be replaced new door systems. All the exterior man doors and frames will be placed at this level. At the upper level, one man door will be replaced. There is an existing storefront system that is approximately 48 feet in length that includes one door will be replaced. Within the existing storefront, there are two AC units this will be replaced with the new storefront and replaced with a new mechanical unit. The existing lighting below the walkway will be removed for construction and replaced with new LED lights. There are two radiant heaters in the offices behind the storefront wall system that will be removed. A new mechanical split systems will replace the existing radiant as a heating source as well as replace the existing window mounted air conditioning units. There will be one new ADA ramp added to the site to provide access to the upper-level elevated walkway. In additional to the new ADA ramp, a new sidewalk will be constructed to provide ADA access to the lower level. The current sidewalk leading to the building from the north approaches at about mid-point between the upper level and lower level. The only current access to the two levels is by stairs. To accommodate ADA requirements, the ADA ramp and sidewalk will be added to access the elevated walkway from both the lower level and from the north sidewalk, meeting the minimum slope requirements. The existing asphalt at the lower level will be replaced up to the driveway. Question Deadline 04/24/2026 The concrete sidewalk at the lower level up against the building will be replaced to better accommodate slope and drainage. Base Bid will be received for: A single lump sum bid for All Work. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. Pre bid meeting notes: Anyone not pre-registered will not be allowed to attend the pre-bid tour. For all other communications, contract the AE as noted below: Mead & Hunt James Hall, PE, SE James.hall@meadhunt.com 608-443-0389 Bid date notes: Hand delivery to the drop box labeled SEALED BIDS ONLY in front of the State of Wisconsin Administration Building located at 101 East Wilson Street, Madison, Wisconsin 53703

Post-Bid

Jails / Prisons

$2,270,000.00

Public - County

Renovation, Site Work

45

27

28

3

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
325
Active Projects
197
Bidding Soon
2,590
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2026

July 6, 2026

Project location map

W10237 Lake Emily Rd, Fox Lake, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.