BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 9, 2026 at 8:00 PM

Updated May 21, 2026

Site work for a transportation facility in Sutton, West Virginia. Completed plans call for site work for a transportation facility.

The scope of the project is to improve the airfield lighting system and install new navigation aids at designated locations at the Braxton County Airport, outside Sutton, West Virginia. The Base Bid consists of removing and installing new LED runway edge and taxiway edge lights. Additive Alternate No. 1 includes removal and installation of new airfield guidance signs. Additive Alternate No. 2 includes removal and installation of new precision approach path indicators (PAPIs). Additive Alternate No. 3 includes removal and installation of runway end identification lights (REILs). The project also includes mobilization and any appurtenances required for a complete project as detailed in the plans and specifications. Each bidder must purchase at least one set of the bidding documents to be included on the Engineer's official bid register. Bids from those not on the official register will be declared non-responsive. Bids must be submitted using a two-envelope system: a sealed main envelope containing the Bid Bond, WV Contractor's License, Contractor's Statement of Qualifications, and all other necessary documents per the bid opening checklist, and a separate sealed envelope inside marked "Bid Proposal" with the completed and signed bid form. Required documents must be included in the main envelope, or the bid will be considered non-responsive and returned. Bids must be accompanied by a certified check or bid bond of at least five percent (5%) of the total bid amount. Bids must comply with federal requirements regarding use of steel and manufactured goods, Buy American certification, and other federal contract provisions. Bidders may not withdraw bids for 150 days after the bid opening. Question Deadline 03/31/2026 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Construction Time Limits – The Contractor will be required to achieve Substantial Completion within 60 calendar days and final completion and readiness for final payment within 90 calendar days of the effective date of the Notice to Proceed.

Bid Results

Transportation Terminals

$68,010.00

Public - County

Site Work

13

16

2

7

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
110
Active Projects
47
Bidding Soon
659
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 7, 2026

May 7, 2026

Project location map

To be determined, Sutton, WV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.