Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 9, 2026 at 8:00 PM
Updated May 21, 2026
Site work for a transportation facility in Sutton, West Virginia. Completed plans call for site work for a transportation facility.
The scope of the project is to improve the airfield lighting system and install new navigation aids at designated locations at the Braxton County Airport, outside Sutton, West Virginia. The Base Bid consists of removing and installing new LED runway edge and taxiway edge lights. Additive Alternate No. 1 includes removal and installation of new airfield guidance signs. Additive Alternate No. 2 includes removal and installation of new precision approach path indicators (PAPIs). Additive Alternate No. 3 includes removal and installation of runway end identification lights (REILs). The project also includes mobilization and any appurtenances required for a complete project as detailed in the plans and specifications. Each bidder must purchase at least one set of the bidding documents to be included on the Engineer's official bid register. Bids from those not on the official register will be declared non-responsive. Bids must be submitted using a two-envelope system: a sealed main envelope containing the Bid Bond, WV Contractor's License, Contractor's Statement of Qualifications, and all other necessary documents per the bid opening checklist, and a separate sealed envelope inside marked "Bid Proposal" with the completed and signed bid form. Required documents must be included in the main envelope, or the bid will be considered non-responsive and returned. Bids must be accompanied by a certified check or bid bond of at least five percent (5%) of the total bid amount. Bids must comply with federal requirements regarding use of steel and manufactured goods, Buy American certification, and other federal contract provisions. Bidders may not withdraw bids for 150 days after the bid opening. Question Deadline 03/31/2026 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Construction Time Limits – The Contractor will be required to achieve Substantial Completion within 60 calendar days and final completion and readiness for final payment within 90 calendar days of the effective date of the Notice to Proceed.
Bid Results
Transportation Terminals
$68,010.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 7, 2026
May 7, 2026
To be determined, Sutton, WV
Related To This Project
Sutton, WV
Bid Date: Jun 09 2026
Sutton, WV
Bid Date: Jun 09 2026
Sutton, WV
Bid Date: Jan 12 2026
Sutton, WV
Bid Date: Jan 08 2026
Sutton, WV
Bid Date: Feb 19 2026
Sutton, WV
Bid Date: Oct 16 2025
Sutton, WV
Bid Date: Sep 04 2025
Sutton, WV
Bid Date: Sep 09 2025
Sutton, WV
Bid Date: Aug 07 2025
Sutton, WV
Bid Date: May 20 2026
Sutton, WV
Bid Date: Jul 22 2025
Sutton, WV
Bid Date: Jul 22 2025
Sutton, WV
--
Sutton, WV
Bid Date: Jul 11 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
