BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 2, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a water / sewer project in Spirit Lake, Iowa. Completed plans call for site work for a water / sewer project.

Work generally consists of approximately 2790 linear feet of channel bank repair including, but not limited to, rotational slide channel bank repair, shallow slide damage channel bank repair, conventional seeding, fertilizing, erosion control, hydro-mulching, and filter sock installation. See Bid Form for exact quantities. Proposals must be submitted on official forms furnished by the Engineer, containing worded and figured prices, be plainly legible, sealed, and addressed appropriately. A Bidder Status Form must be included; failure to submit a fully completed form may result in the bid being rejected. A certified check or bid bond not less than ten percent of the total bid amount must be included in a separate sealed envelope, plainly marked 'bid bond,' and may be forfeited as liquidated damages if the successful bidder fails to execute the contract properly. An optional paper set of proposal forms and specifications may be obtained from the Engineer's office for a refundable deposit if returned in good condition within 14 days after the public hearing date. Question Deadline 03/27/2026 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing.

Award

Water / Sewer

$94,010.00

Public - County

Site Work

32

11

2

6

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
31
Bidding Soon
491
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2026

May 4, 2026

Project location map

Multiple Locations, Spirit Lake, IA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.