BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 1, 2026 at 8:00 PM

Updated April 2, 2026

Remodeling of a military facility in Venice, Louisiana. Completed plans call for the remodel of a military facility.

The requirement is to replace flooring throughout the second floor of the Units Multipurpose Building in accordance with the attached scope of work and specifications. Work includes examining all existing conditions prior to quoting, taking field measurements, evaluating current flooring surfaces, and ensuring full familiarity with the facility conditions under which the work will be performed. All labor, materials, equipment, and services necessary to complete the flooring replacement must meet the detailed requirements provided by the U.S. Coast Guard, including all construction wage determinations and applicable FAR Part 36 provisions. Quotes must include pricing, a technical approach demonstrating understanding of the work, and past performance. Evaluation will be conducted on a lowest-priced technically acceptable basis. This action is 100% set aside for small business, and quoters must be actively registered in SAM.gov. Arrangements for site visits must be coordinated with the designated point of contact. Location: United States Coast Guard Station Venice 436 Coast Guard Road, Venice, LA 70091 United States Coast Guard Station Venice is accepting proposals for qualified individuals or firms to complete removal of current flooring system/systems throughout the second floor of the Units Multipurpose Building in the following spaces: Galley and berthing room number 227. The total area is estimated at approx. 650 Sq Ft. Flooring in the Galley must be replaced with industry standard tile flooring for galleys in a grey finish. Flooring and subfloor in berthing room number 227 must be removed, investigated to see what caused subfloor to rise, repair issue, and replace subfloor and tile with tile that matches the tile already installed or provide examples of how you can blend a different color tile. IE: Replacing tile from door frame to area that is damaged with a boarding tile to create a boarder around new different color tile. Proper same material type and matching transition strips shall be installed at each doorway and all floor transition areas. Upon completion of the flooring, contractor shall install new tile trim along walls of where flooring was replaced to the same height as tile trim that was removed. Prior to submitting a quote, it is mandatory to examine the scope of work, and it is highly recommended to visit the facility to take field measurements, evaluations, etc., and become familiar with existing conditions under which the work will be performed. After the award of contract, a pre-conference will be held prior to starting the work at Coast Guard Station Venice. The United States Coast Guard is accepting quotes for qualified individuals or firms to replace flooring system /systems throughout the second floor of the Station Venice (LA ) Multipurpose Building . All work is to be completed in accordance with the scope of work / contract specifications . The scope of work includes details of what the USCG needs along with photos . This will be a firm -fixed priced purchase order awarded to the lowest price technically acceptable offer . The evaluation factors are : - Price - Technical Acceptability - Past Performance

Post-Bid

Military

$10,000,000.00

Public - Federal

Remodeling

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
27
Bidding Soon
363
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2026

June 1, 2026

Project location map

436 Coast Guard Rd, Venice, LA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.