Published April 10, 2026 at 8:00 PM
Updated May 20, 2026
Site work, paving and outdoor lighting for a road / highway in Snowmass Village, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; and for outdoor lighting for a road / highway.
Reference Number 0000416498 The Town of Snowmass Village Public Works - Road Division annually contracts the placement of pavement marking twice a year once to its main roads and some arterial roadways. The first application is in May (Spring) and the second application is in early October (Fall). It is intended that this project will conform to the Town's aesthetic, and design specifications found below. Terms and Conditions 1. The contractor must apply pavement markings between May 13 and June 6, then again September 23 through October 11, unless agreed upon date change by Town Public Works. Weather conditions can also be a time factor which can cause rescheduling. 2. Locations a. Main Roads - Brush Creek Road, Owl Creek Road, Highline, Divide and Carriageway Roads (Double Yellow centerline w/white edging lines). b. Arterial Roads - Pine Crest, Spruce Ridge, Two Creeks, Faraway, Ridge, Meadow, Sinclair, Snowmass Club Circle and Horse Ranch roads. (Double Yellow centerline) arterial roadways to be approved at time of application. 3. All personnel must wear type two traffic safety vests working in roadways. 4. All employees must wear the appropriate personal protection equipment. 5. All vehicles must be legal to use on public roadways or have sign off from town police. 6. Town Road Division will be responsible for sweeping roadways before the scheduled pavement marking will be applied. 7. The contractor shall notify contractor administrator on days applications are being applied. 8. Roadway marking must be coned off until paint is properly dried to ensure that tracking of paint will not occur. 9. All main roadways must be signed with advance warning of "Roadway Marking Being Applied". a. Advance warning signage is required meeting MUTCD standards. 10. Turn lane markings are included in this scope. 11. Before pavement marking can be applied to the pavement, the surface must be dry and temperatures of 50 degrees F and rising are mandatory. 12. Pavement Marking Materials Standard 708.05, or acceptable alternate. 13. The Contractor must have proper equipment to access and efficiently apply pavement marking meeting OHSA safety requirements. 14. Application rate of one gallon per one hundred square feet (.01 gal/sq. ft.) shall be utilized. 15. Thermal Plastic may be used but must be inlayed. 16. Work areas will be maintained in a safe, clean, and organized condition. 17. The Contractor shall provide to the Town the services defined in the Special Provisions, referenced and included herein, consistent with the Bid Schedule referenced and included herein. This references the following project within the Town: Road Striping 2026, pursuant to the pricing, representations, and acknowledgements stated in the Contractor's Bid Schedule dated and pursuant to the Project Specifications included in the bid documents. 18. Such services shall include contracting for, coordinating, and scheduling other Contractors or sub-contractors as needed to accomplish the work described in the Special Provisions and the Bid Schedule, irrespective of whether the work performed by these subcontractors are explicitly identified within the proposal. 19. Safety Data Sheet for products you will be applying. The Town of Snowmass Village Public Works - Road Division contracts twice a year for the placement of pavement markings. The striping will be on the main arteries and some arterial roadways. The first application is in May (Spring), and the second application is in early October (Fall). This project is intended to conform to the town's aesthetic and design specifications, which are found below. Question Deadline 04/02/2026 at 3:00 PM MT Questions are submitted online No, Questions regarding this IFB should be directed via email exclusively to the Town Contract Administrator at the above noted email address. All Bids and correspondence related to this RFQ and the scope of work will be conducted in English. Shaun LeeKing Email; sleeking@tosv.com 970-923-5110 Ext.301 The Town in its sole and absolute discretion, may reject any or all Bids or cancel and withdraw this RFQ or the Project at any time or for any reason, and may, in its sole and absolute discretion, waive any non-conformance or non-compliance with the requirements specified in this RFQ.
Post-Bid
Roads / Highways
$500,000.00
Public - City
Outdoor Lighting, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 8, 2026
May 11, 2026
Multiple Locations, Snowmass Village, CO
Related To This Project
Snowmass Village, CO
Bid Date: Apr 10 2026
Snowmass Village, CO
Bid Date: Mar 12 2026
Snowmass Village, CO
Bid Date: Oct 07 2025
Snowmass Village, CO
Bid Date: Sep 17 2025
Snowmass Village, CO
--
Snowmass Village, CO
Bid Date: Aug 01 2025
Snowmass Village, CO
--
Snowmass Village, CO
Bid Date: Jul 11 2025
Snowmass Village, CO
Bid Date: May 16 2025
Snowmass Village, CO
Bid Date: Apr 28 2025
Snowmass Village, CO
Bid Date: Apr 09 2025
Snowmass Village, CO
Bid Date: Apr 07 2019
Snowmass Village, CO
Bid Date: Mar 07 2019
Snowmass Village, CO
Bid Date: Jul 15 2020
Snowmass Village, CO
Bid Date: Aug 18 2021
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.