BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 22, 2026 at 8:00 PM

Updated May 23, 2026

Renovation of an educational facility in Bakersfield, California. Completed plans call for the renovation of a educational facility.

The project is Stiern Middle School - Exterior Painting. Bidders are required to possess a BP-01 Exterior Painting (C-33) State of California contractor's license and be registered as a public works contractor with the Department of Industrial Relations. Mandatory prequalification applies to all general contractors and certain subcontractors. Bids must be submitted on the District's form and accompanied by a bid bond or cashier's/certified check in the amount of ten percent (10%) of the total bid price. The successful bidder must provide a 100% Performance Bond and a 100% Payment Bond. All workers must be paid not less than the general prevailing wage rate. The project is subject to labor compliance monitoring and enforcement by the Department of Industrial Relations. The contract will be awarded to the lowest responsive responsible bidder based on the base bid amount only. The Board reserves the right to reject any and all bids and/or waive any irregularity in any bid received. Instructions include mandatory prequalification, attendance at a mandatory job walk and site visit, and requirements for completion of bid forms and submission of required securities and certifications. Project Start Date: June 1st 2026 Project Completion Date July 31st, 2026 Question Deadline 03/24/2026 All questions about the meaning or intent of the Contract Documents are to be directed via email to the District to zasoskil@bcsd.com and orozcob@bcsd.com Questions received less than SEVEN (7) calendar days prior to the date for opening bids may not be answered. Refer to attached site map for scope of work locations. Prep, patch and re-paint per above specifications the entire EXTERIOR of all permanent and portable site buildings (Building 100 - Admin, Library Media Center, Classrooms 102-104), (Building 200 - Classrooms 201-210), (Building 300 - Classrooms 301-310), (Building 400 - Classrooms 401-406), (Building 500 - Classrooms 501-510), (Building 600 - Classrooms 601-610), (Building 700 - Classrooms 701- 710), (Building 800 - Classrooms 801-810), (Building 900 - Multi Center, Kitchen, Classrooms 901-907)) including but not limited to all exterior wall surfaces (lower and upper areas), eaves, soffits, all fascia, trims, interior and exterior of all exterior doors and door frames, all windows that are painted, posts/columns, covered walkways, decorative and structural metal work, iron decorative security fencing, all brick surfaces and metal storage containers in vicinity of buildings

Bid Results

Educational

$182,250.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
131
Active Projects
55
Bidding Soon
802
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2026

June 4, 2026

Project location map

2551 Morning Dr, Bakersfield, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.