BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 28, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a transportation facility in Des Moines, Iowa. Completed plans call for site work for a transportation facility.

The work generally consists of pavement removal, subgrade and granular subbase preparation, PCC pavement, pavement markings, site restoration, and traffic control for the North General Aviation Apron Taxilane Relocation at Des Moines International Airport, Contract No. 2026-06-20. Each bidder must submit bid security in the amount of ten percent of the bid, which may be a cashier's check, certified check, certified share draft, or a bid bond with satisfactory surety. The successful bidder will be required to furnish performance and payment bonds in an amount equal to one hundred percent of the contract price. These bonds must guarantee faithful performance of the contract, prompt payment for materials and labor, and the maintenance of the work for two years after acceptance. All proposals will be evaluated, and the award will be made to the lowest responsive and responsible bidder, though the Authority reserves the right to reject any or all bids or waive informalities. Bidders must submit a completed Bidder Status Form. Sales tax should not be included, as a sales tax exemption certificate will be provided. Preference will be given to Iowa products and provisions, and resident bidders will be given preference against nonresident bidders as dictated by Iowa statutes. Disadvantaged business enterprises will be afforded a full and fair opportunity to submit bids and will not be discriminated against based on race, color, or national origin. The work shall be performed within the security fence of the airport to the east of Building 70. Building 70 is located at 2710 McKinley Ave. Des Moines, Iowa. The Engineer's opinion of probable construction cost for the Work is between $808,000 and $895,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 03/26/2026 All questions about the meaning or intent of the Bidding Documents are to be submitted to ENGINEER in writing, either through mail, email, or fax. Contact individual shall be as follows: Andrew Gettler, P.E. Foth Infrastructure & Environment, LLC 106 SW 7th Street, Suite 200 Des Moines, Iowa 50309 515-254-1393 (Office) Andrew.Gettler@Foth.com

Bid Results

Transportation Terminals

$913,276.00

Public - City

Site Work

27

13

25

6

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
49
Bidding Soon
1,075
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 7, 2026

May 4, 2026

Project location map

2710 McKinley Ave, Des Moines, IA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.