BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 17, 2026 at 8:00 PM

Updated March 18, 2026

Renovation of a water / sewer project in Santa Rosa, California. Conceptual plans call for the renovation of a water / sewer project.

Sonoma Water's Wohler Facility is equipped with three (3) 2.0-megawatt standby generators that provide critical backup power to both the Wohler and Mirabel facilities during utility outages. These generators, now approximately 25 years old, have played a vital role in maintaining operational continuity through numerous Public Safety Power Shutoff (PSPS) events, wildfires, and other emergency power. In 2021, the generator system failed during a utility outage. Troubleshooting revealed that the failure was due to obsolete synchronization controls, which are no longer supported by the manufacturer. Fortunately, Sonoma Water had spare components available, enabling a temporary repair. However, this incident highlighted the need for a long-term solution to ensure the reliability of the backup power system. To maintain the operational integrity of these critical assets, Sonoma Water plans to upgrade the control systems for all three generators. This upgrade will replace outdated synchronization and control components with modern, supported systems, improve reliability, maintainability, and future serviceability of the generators, extend the useful life of the existing generator units, provide a cost-effective alternative to full generator replacement, which would be significantly more expensive and time-intensive. The project is included in the County's 2025-2030 Capital Improvement Program (CIP). As of March 17, 2026, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$250,000.00

Public - County

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
12
Bidding Soon
1,501
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2026

Project location map

Multiple Locations, Santa Rosa, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.