BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 20, 2026 at 8:00 PM

Updated May 21, 2026

Site work for a civil project in Coeur D Alene, Idaho. Completed plans call for site work for a water / sewer project.

Work associated with the proposed project is generally described as follows: Schedule A - Intake System, Booster Station, and Treatment Facility: Replacement of existing intake system including pumps, piping, and fittings; upgrades to existing treatment facility including filter replacement, mechanical piping and fitting replacement, and installation of two new final filters replacement of existing booster station including booster pumps, mechanical piping and fittings, and building structure; and installation of new lower reservoir including tanks and piping. Schedule B - Lower Distribution: Distribution upgrades from the booster station to the lower portion of the camp (past the Lodge and Tamarack), including replacement of existing water piping and fittings and installation of new yard hydrants. Schedule C - Upper Reservoir Distribution: Distribution upgrades from the booster station to the existing upper reservoir, including replacement of existing water piping and fittings and installation of new yard hydrants. Schedule D - Upper Distribution: Distribution upgrades from the upper reservoir water line to the upper distribution area (from Connemara to Echo), including replacement of existing water piping and fittings and installation of new yard hydrants. Schedule E - Reservoir Coating: Re-coating the exterior of the existing upper reservoir and appurtenances. Schedule F - Backup Generator: Installation of a standby generator. ARPA GRANT PROJECT DW2306AP This project is funded by an Idaho Clean Water State Revolving Fund (SRF) Loan and is subject to all requirements set forth in the contract documents. A Bid Guaranty of 5 percent of the Bid Amount is required. Separate Performance and Payment Bonds each in the amount of 100 percent of the Contract Amount will be required. Each bidder must supply all the information required by the Bid Documents and Specifications. This Project is financed by ARPA and IDEQ SRF funds and is subject to all requirements set forth in the contract documents including, but not limited to, compliance with Build America, Buy America (BABA) and Davis-Bacon Wage Rate requirements. All contractor, subcontractor, and/or specialty contractor shall be required to have a current license as a Public Works Contractor in the State of Idaho in order to submit a bid or proposal on this project. All questions shall be directed in writing to Meghann Kolb at Ardurra, mkolb@ardurra.com. Pre-bid meeting info : Access to the project site will be provided via the Camp Sweyolakan boat, which will transport participants to the pre bid meeting location. The boat will depart the landing no later than 10:05 a.m. Attendees are responsible for arriving early enough to ensure timely boarding.

Post-Bid

Water / Sewer

$2,290,820.00

Public - City

Site Work

56

19

6

4

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
47
Active Projects
33
Bidding Soon
413
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2026

June 16, 2026

Project location map

3258 W Lutherhaven Rd, Coeur D Alene, ID

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.