BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 28, 2026 at 8:00 PM

Updated June 10, 2026

Renovation of an educational facility in Medford, Oregon. Completed plans call for the renovation of a educational facility.

The project will be awarded to one contractor based on the lowest bid. The purpose and intent of Invitation to Bid #26-01-25 is to establish a firm fixed price contract with one qualified source to replace the roofs on the NMHS Graphic Arts building and the NMHS Science building. The district reserves the right to (1) reject any Proposal not in compliance with all prescribed public bidding procedures and requirements, (2) to add to the price bid by nonresident bidders an increase equal to the percent preference that the nonresident bidders home state would give it's instate bidders and (3) to reject for good cause any or all Proposals that are not in the best interest of the district (4) to reject any or all proposals, in whole or in part, to waive any formalities and to delete items prior to making the award, whenever its is deemed in the sole opinion of the Medford School District to be in the best interest of the District. NMHS Graphic Arts roof and breezeway roof project scope Clean and Prep roofing surface. Remove and dispose of debris. Install 1/2 " fanfold over existing roofing. Install 60 mil PVC membrane per industry standard. o Follow Carlisle 20 year NDL warranty specifications. Flash all walls, pipes and curbs per manufacturer's specifications. Cap metal at wall to be removed and single ply membrane to be run up and over wall. New cap metal installed. Reinstall any drain rings. Any scupper drains need to be refabricated and installed. Clean up and haul away debris created by roofing work. NMHS Science building roof scope Clean and Prep roofing surface. Remove and dispose of debris. Install 1/2 " fanfold over existing roofing. Install 60 mil PVC membrane per industry standard. o Follow Carlisle 20 year NDL warranty specifications. Flash all walls, pipes and curbs per manufacturer's specifications. Fabricate and install roof related sheet metal as needed. Including new cap metal. Reinstall any drain rings. Any scupper drains need to be refabricated and installed. Clean up and haul away debris created by roofing work. April 6, 2026 Last Questions and Protests Due, no later than 2:00 p.m. - Question must be addressed in writing via email to Pam.Thoren@medford.k12.or.us. No other contact regarding this solicitation during the solicitation process shall be permitted. April 7, 2026 Last Addendum 2:00 p.m.

Award

Educational

$140,736.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
19
Bidding Soon
259
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2026

June 5, 2026

Project location map

1900 N Keene Way Dr, Medford, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.