BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 13, 2026 at 8:00 PM

Updated May 21, 2026

Demolition, site work and new construction of a civil project in Hodges, Alabama. Completed plans call for the demolition of a water / sewer project; water / sewer project; and water / sewer project.

Hodges Well House Rehabilitation Project: Demolish and construct a new well house including sitework, yard piping, and valves. The contract time is 90 consecutive calendar days, with liquidated damages assessed if exceeded. Extensions must be approved prior to the completion date. The contract time is 120 consecutive calendar days, with liquidated damages if the contract time is exceeded. Extensions must be approved prior to completion date. Plans and specifications are available at the Town of Hodges office or may be obtained from the engineers upon payment of a deposit. The deposit is refunded in full to each prime contractor submitting a bid. All guidelines for ARPA Funded Projects apply. Instructions to bidders include the requirement to contact the office if they wish to place a bid. The project objectives for utilization of Minority Business Enterprises (MBEs) and Women's Business Enterprises (WBEs) are as follows: Commodities (Supplies) MBE 4% WBE 11% Contractual (Services) MBE 8% WBE 30% Equipment MBE 5% WBE 20% Construction MBE 2.5% WBE 3%

Bid Results

Water / Sewer

$186,000.00

Public - City

Demolition, New Construction, Site Work

12

20

2

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
70
Bidding Soon
774
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 6, 2026

May 6, 2026

Project location map

To be determined, Hodges, AL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.