BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 17, 2026 at 8:00 PM

Updated May 21, 2026

Site work for a water / sewer project in Flagstaff, Arizona. Completed plans call for site work for a water / sewer project.

Installation of a secondary sewer line is required to service seven recreational vehicle sites at Sunset Crater Volcano National Monument. Work includes constructing a new sanitary sewer main and service connections for the RV sites, installing a cleanout for the existing apartment building sanitary sewer line, and performing associated asphalt surfacing. The project is conducted as a construction contract and includes all labor, materials, equipment, and coordination necessary to complete the sewer installation in accordance with provided specifications. A site visit is scheduled, and questions and quotes must be submitted electronically to the designated contracting official. Sunset Crater Volcano National Monument (SUCR) requires the installation of a secondary sewer line in order to service 7 Recreational Vehicles (RV) spots. Work consists of constructing new sanitary sewer main and services for recreation vehicle sites, construct a clean out for the existing apartment building sanitary sewer service as surfacing asphalt. Please see attached for additional specifications. Question Deadline 03/27/2026 Questions are due electronically to lindsay_mclaughlin@ios.doi.gov three (3) days after site visit. Government responses will be posted as an amendment to the solicitation to any question(s) received. Project Location: sunset Crater Volcano National Monument, Housing and RV site area, Arizona. Park is located north of Flagstaff on US Highway 89. Project site is located approximately 2- miles from US Hwy. 89 along Loop Road. B. The Work consists of: 1. Construct new sanitary sewer main and services for recreation vehicle sites, construct a cleanout for the existing apartment building sanitary sewer service and abandon in place the existing sanitary sewer for the RV sites. Scope also includes asphalt and surfacing removal/replacement. A water main will also be raised where it crosses the sewer main. C. Project will be constructed under a single prime contract. Location: Sunset Crater Volcano National Monument 6082 Sunset Crater Road Flagstaff, AZ 86004 USA The magnitude for this project is between $25,000.00 and $100,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$100,000.00

Public - Federal

Site Work

8

8

4

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
13
Bidding Soon
227
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2026

May 1, 2026

Project location map

6082 Sunset Blvd, Flagstaff, AZ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.