BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 30, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a water / sewer project in Port Angeles, Washington. Completed plans call for site work for a water / sewer project.

The project consists of work defined within a Base Bid and an Additive Bid. In general and in total, the project includes but is not limited to the following: installation of new 12 to 18-inch nominal diameter PVC gravity sewer main within an existing and active sewer alignment via open cut construction within existing right-of-way, with sewer service maintained throughout construction via bypass pumping; installation of new 8-inch DIP potable water main to replace existing 8-inch AC water main; installation of new 10-inch DIP potable water main to replace existing 10-inch CI water main; replacement of 4 water gate valves; removal, disposal, replacement, and reconnection of 16 sanitary sewer manholes; removal, disposal, replacement, and reconnection of 9 stormwater catch basins; installation of 2 new curb ramps; installation of new 6-inch PVC storm drain laterals to replace existing storm drain laterals where impacted by gravity sewer main construction; demolition of existing sanitary sewer piping along the new gravity sewer alignment; demolition and replacement of various existing roadway and site features along the gravity sewer alignment; trench, roadway, and roadside restoration of the site. The work will be performed within City property including rights-of-way and easements. All questions regarding the plans and specifications shall be submitted no later than Tuesday, March 31st, 2026 by 5:00 pm PST, in writing or electronically to Lucio Baack, P.E. Project Manager, at Lbaack@cit-yofpa.us. The Engineers estimate is $3,200,000 $4,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. time of completion (performance. period) is 85 working days. The City reserves the right to reject any and all Bids not in compliance with all prescribed procedures and requirements, waive minor irregularities not affecting substantial rights and make the award as deemed to be in the best interest of the City, and may for good cause, reject any or all bids upon a finding of the City of Port Angeles that it is in the public interest to do so. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Post-Bid

Water / Sewer

$4,000,000.00

Public - City

Site Work

21

6

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2026

June 8, 2026

Project location map

To be determined, Port Angeles, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.