Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 4, 2026 at 8:00 PM
Updated May 21, 2026
Site work and paving for a mixed-use development in Marshall, Minnesota. Completed plans call for site work for a road / highway; water / sewer project; sidewalk / parking lot; for paving for a road / highway; and sidewalk / parking lot.
The project consists of reconstruction and utility replacement on South 5th Street from West Main Street to Saratoga Street. All utilities will be replaced, including watermain, sanitary sewer, and storm sewer within the identified areas. The project includes new water and sewer services to the right-of-way, pavement removal, aggregate base, bituminous surfacing, concrete driveways, sidewalks, curb and gutter, and other minor work. Major estimated work items are: common excavation (963 CY), aggregate base (956 CY), 12" PVC pipe sewer (546 LF), 15" RC pipe sewer class III (188 LF), 36" span RC pipe-arch sewer CL IIA (172 LF), 6" PVC watermain (623 LF), 10" PVC watermain (80 LF), 48" DIA. sanitary sewer manhole (7.6 LF), 4" concrete walk (5,309 SF), and concrete curb & gutter, design B618 (1,261 LF). All bidders are required to become acquainted with the extent of the work and the conditions under which the work will be performed. All bids must be submitted electronically and accompanied by a deposit or bond of not less than 10% of the bid. The City Council reserves the right to reject any or all bids, waive minor defects, technicalities, or informalities, or advertise for new proposals, and accept the bid deemed to be in the City's best interest. Plans and specifications are available at the Office of the City Engineer or may be downloaded online. Prospective bidders must register as a Plan Holder to download plans and specifications. No bidder may withdraw a bid for at least 30 days after the scheduled closing time for receipt of bids. Bid results will be posted to online following bid opening All bids shall be made electronically and shall be accompanied by a cash deposit, cashier's check, bid bond or certified check, payable to the order of the City for not less than 10% of the bid. The City Council reserves the right to reject any or all bids or any part of any bid, to waive minor defects, technicalities, or any informalities in the bidding or to advertise for new proposals, and to accept that bid deemed to be in the City's best interest.
Award
Roads / Highways
$679,229.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 10, 2026
May 11, 2026
S 5th St, Marshall, MN
Related To This Project
Marshall, MN
Bid Date: May 14 2026
Marshall, MN
Bid Date: Jun 02 2026
Marshall, MN
Bid Date: Jun 01 2026
Marshall, MN
Bid Date: May 07 2026
Marshall, MN
Bid Date: May 28 2026
Marshall, MN
--
Marshall, MN
Bid Date: Aug 13 2020
Marshall, MN
--
Marshall, MN
Bid Date: Mar 10 2026
Marshall, MN
Bid Date: Mar 17 2026
Marshall, MN
Bid Date: Feb 03 2026
Marshall, MN
Bid Date: Feb 17 2026
Marshall, MN
Bid Date: Feb 10 2026
Marshall, MN
Bid Date: Jan 22 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
