BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 25, 2026 at 8:00 PM

Updated May 20, 2026

Renovation of a mixed-use development in Moorestown, New Jersey. Completed plans call for the renovation of a educational facility; educational facility; and educational facility.

A. The project consists of the FA, PA, and Clock Replacement at Various Schools for the Moorestown Township Public School District, Board of Education, Burlington County, New Jersey. B. Contract Documents prepared by Fraytak Veisz Hopkins Duthie, P.C. Architects / Planners, (Project Number: FVHD-5667) and their Consulting Engineer: 1. Consulting Mechanical/Electrical Engineer: Gillan & Hartmann, Inc., Audubon, PA. A. The work consists of but is not limited to the following 1. All Site Work including indicated access roads, areas, utility services and waste water treatment system. 2. All other indicated work. B. Single Overall Contract includes: 1. All Work in accordance with Drawings, Parts 2, 3, 5 and 6 Specification Sections and in accordance with Bid Documents. DISCLAIMER: ALL QUALIFIED BIDDERS/CONTRACTORS INTENT ON SUBMITTING A BID PROPOSAL FOR THIS PROJECT ARE REQUIRED TO REGISTER THEIR COMPANY WITH, AND OBTAIN ORIGINAL BID DOCUMENTS FROM, FRAYTAK VEISZ HOPKINS DUTHIE, PC (FVHD) ARCHITECTS-PLANNERS, 1515 LOWER FERRY ROAD, TRENTON, NEW JERSEY 08618, (609) 883-7101. Removal and replacement of existing fire alarm and detection systems at George C. Baker E.S., Mary E. Roberts E.S., Upper E.S., William Allen M.S., and Moorestown High School. New work includes new electrical wiring and device installation of new fully addressable fire alarm and detection systems at the previously listed buildings, and new main control and annunciator panels. Removal and replacement of existing analog public address systems and clock systems at George C. Baker E.S., South Valley E.S., Upper E.S., and William Allen M.S. New work includes new electrical wiring, cabling, and device installation of new data network system based public address and clock systems for the previously listed buildings. Additional work includes providing CAT-6E cable, data racks, and patch panels at various locations. Pre-Bid Meeting 03/26/2026 at 11:00 AM ET Electronic bid documents are available for no fee through the architect's contractor portal. Hard copies are available for a set fee. All requests for information must be submitted in writing and must reference the architect's project name and number. Question Deadline 03/31/2026 All Requests for Information (RFI) must be submitted in writing and sent to info@fvhdpc.com, or fax to 609-883-2694 or via common carrier to the architect at t

Bid Results

Educational

$5,416,000.00

Public - City

Renovation

121

14

6

9

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,009
Active Projects
523
Bidding Soon
7,333
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 22, 2026

June 29, 2026

Project location map

Multiple Locations, Moorestown, NJ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.