Published May 5, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a water / sewer project in Fitchburg, Wisconsin. Completed plans call for site work for a water / sewer project.

As of May 05, 2026, project was awarded to Speedway Sand & Gravel, Inc., awarded amount is $2,321,734.24 Project includes storm sewer and water construction. Contractor shall provide all items, articles, materials, operations or methods mentioned or scheduled on the drawings or herein specified: including all labor, supervision, equipment, incidentals, taxes and permits necessary to complete the Work as described within the Contract Documents. Contractor shall install all items provided by Owner as mentioned or scheduled on the drawings or herein specified. Proposals shall be accompanied by a Bid Bond or Certified Check in the amount of 5% of the bid, payable to the Fitchburg Treasurer, as a guarantee that the bidder, if the bid is accepted, will execute and file Contract and Bond within 15 days of award. Performance and Payment Bonds each 100% of the bid, with executed Contract is required of successful bidder. Q/A:- All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received less than ten days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. The work in the Belmar Neighborhood shall be substantially complete on or before August 1, 2026. The work in the Tower Hill Neighborhood shall be substantially complete on or before September 1, 2026. All work shall be completed and ready for final payment in accordance with paragraph 14.07 of the General Conditions on or before October 15, 2026. It is anticipated that the Notice to Proceed will be issued around May 10, 2026.

Award

Water / Sewer

$2,321,734.00

Public - City

Site Work

45

18

6

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 6, 2026

May 10, 2026

Project location map

To be determined, Fitchburg, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.