BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 15, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a mixed-use development in Santa Barbara, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The project is located at three uncontrolled crosswalks near Hope Elementary and Monte Vista Elementary. The work includes performing curb extension enhancements at the school crosswalk next to Hope Elementary School on La Colina Road. Rectangular Rapid Flashing Beacons (RRFBs) and lighting will be added at the three intersections, requiring installation of foundations. Bidders are required to submit electronic bids with a bid bond of 10%, a payment bond of 100%, and a performance bond of 100%. The project duration is 30 days. The response format is electronic, and responses must include line items, subcontractor information, bid bond, and bid proposal. The project falls under several categories, including construction services, demolition, paving, concrete, and traffic control services. License requirement is A. Liquidated Damages $3,600/day Project Duration 30 days Pre-Bid Meeting No Online Q&A Yes Contact Info Eric Goodall, 805-897-2615 egoodall@SantaBarbaraCA.gov Q&A Deadline 04/03/2026 3:00 PM (PDT)

Award

Sidewalks / Parking Lot

$262,735.00

Public - City

Paving, Site Work

6

12

2

5

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
161
Active Projects
87
Bidding Soon
986
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2026

July 15, 2026

Project location map

3970 La Colina Rd, Santa Barbara, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.