BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 8, 2026 at 8:00 PM

Updated May 15, 2026

Site work and paving for a road / highway in Saint Michael, Minnesota. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Reconstruction of CSAH 36 from I-94 to Hwy 101 in the City of St. Michael, including a roundabout, curb and gutter, storm sewer, pond, and multi-use trail for a length of 2.128 miles. The approximate major items of work are: removal of bituminous pavement (58,987 SY), excavation common/subgrade (81,589 CY), select granular embankment (CV) (24,777 CY), aggregate base class 5 (CV) (17,425 CY), concrete pavement 7.5" (7,493 SY), Type SP 9.5 wearing course mix (4,C) (11,343 TON), Type SP 12.5 non-wearing course mix (4,B) (5,675 TON), prefabricated modular block wall (8,878 SF), 12" - 24" RC pipe sewer design 3006 (9,767 LF), 27" - 30" RC pipe sewer design 3006 (380 LF), construct drainage structure (48-84)-4020 (405 LF), 3" bituminous walk (104,333 SF), concrete curb and gutter design B418, B424, B618, R424 (23,050 LF), and lighting unit (10 EA). Minimum wage rates to be paid by the Contractors have been predetermined and are subject to the Work Hours Act of 1962, P.L. 87-581 and implementing regulations. PROJECTS: SP 086-636-009 / SP 086-636-010 / SP 227-090-010

Bid Results

Roads / Highways

$9,163,252.00

Public - County

Paving, Site Work

5

9

4

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
260
Active Projects
140
Bidding Soon
1,169
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2026

May 4, 2026

Project location map

I-94, Saint Michael, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.