BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 16, 2025 at 8:00 PM

Updated August 5, 2025

Site work and paving for a mixed-use development in Saint Michael, Minnesota. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Question Deadline 06/23/2025 Questions received less than seven days prior to the date for opening of Bids may not be answered. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Direct questions about this Project to Nicholas Preisler at 763-416-7936 and nickp@stmichaelmn.gov. Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows The furnishing of all labor, materials, tools, and equipment necessary to complete the bituminous street milling, concrete curb & gutter, concrete sidewalk, paving, and appurtenant work. The Website Will Be Updated Periodically With Addenda, Lists of Registered Plan Holders, Reports, and Other Information Relevant to Submitting a Bid For the Project. All Official Notifications, Addenda, and Other Bidding Documents Will Be Offered Only Through the Website Online Neither Owner Nor Engineer Will Be Responsible for Bidding Documents, Including Addenda, if Any, Obtained From Other Sources. Bids Will Only Be Accepted via the Electronic Bidding Service Through Online. The City Council Reserves the Right to Reject Any and All Bids And to Waive Any Bids Received Without Explanation. No Bid May Be Withdrawn for a Period of 60 Days. For All Further Requirements Regarding Bid Submittal, Qualifications, Procedures, and Contract Award, Refer to the Instructions to Bidders That Are The Project Includes the Furnishing of All Labor and Materials for the Construction Complete in-place, of the Following Approximate Quantities: 54,000 S Y Mill Bituminous Surface (Tapered, Full Width) 4,500 S Y Mill Bituminous Surface (Full Depth) 450 L F Remove and Replace Concrete Curb and Gutter 38,500 L F Curb Line Mastic Joint Adhesive 5,400 Ton Type Sp 9.5 Wearing Course Mixture (2,c) - Roadway 2,600 S F 6" Concrete Walk The Provisions of Minn. Stat. 16c.285 Responsible Contractor Are Imposed as a Requirement of This Contract. All Bidders and Persons or Companies Providing a Response/submission to the Advertisement for Bids of the City of St. Michael Shall Comply With the Provisions of the Statute.

Award

Roads / Highways

$627,879.00

Public - City

Paving, Site Work

21

11

5

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
238
Active Projects
117
Bidding Soon
1,499
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2025

July 28, 2025

Project location map

Multiple Locations, Saint Michael, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.