BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 28, 2026 at 8:00 PM

Updated May 16, 2026

Demolition, site work and addition to an educational facility in Sacramento, California. Completed plans call for the addition of a educational facility.

California as the Lease-leaseback Prime Contractor for the Relocatable Additions Project at Arnold Adreani Elementary School. Project Description: Relocation of (1) Existing Portable Building Located on This Site to a New Location on This Site. This Would Include Disconnection of and Reconnection of Utilities. Site Coordination Work for the Installation of (4) Leased Buildings. Buildings to Be Set and Placed by the Leasing Company. Connection of Utilities to Buildings. Installation of Underground Utilities, to Include Water, Wastewater, Power and Low Voltage, to All (5) Buildings. Installation of Low Voltage to Interior of Buildings, to Include Fire Alarm, Intrusion and Data. Minor Alternations of Units D1, D2, D3, D4 and D5.installation of Ramp, Platform and Fencing. Subcontractors Must Comply With All Skilled and Trained Workforce Compliance Requirements Per the Education Code 17407.5 and Public Contract Code 2600-2603. This Project Requires Contractors to Be Registered With the California Department of Industrial Relations and Possess an Active Dir# Throughout the Entire Project Duration. The Project Requires Prevailing Wages. F&h Construction is Signatory to the Carpenters and Laborers Unions, and All Scopes Covered by These Agreements Shall Be Signatory. Prime Contract Terms and Conditions Shall Apply to All Subcontracts. There is a Disabled Veterans Business Enterprise (Dvbe) Good Faith Effort Requirement of 3%. Please Note:time is of the Essence for This Project. All Work Must Be Fully Completed No Later Than August 1, 2026 (the ""Date for Completion"").mechanical, Electrical & Plumbing (Mep) Subcontractors Are Required to Be Pre-qualified With Elk Grove Unified School District. All Requests for Information (RFI's), and Any Questions Must Be Submitted in Writing to F&h Construction, INC. (Per Cc) at Estimating@f-hconst.com No Later Than, Friday, May 8th, 2026, 12:00 Pm.

Post-Bid

Educational

$1,200,000.00

Public - City

Addition, Demolition, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
445
Active Projects
195
Bidding Soon
2,322
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2026

July 14, 2026

Project location map

9927 Wildhawk W Dr, Sacramento, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.