Black Friday through Cyber Monday: Get 10% off Project Intelligence

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 24, 2026 at 7:00 PM

Updated November 26, 2026

Site work and paving for a road / highway in Medford, Oregon. Completed plans call for site work for a road / highway; and for paving for a road / highway.

ackson County Curb Ramps Phase 4 Project Various Highways Roger Thom, RE Jackson County Curb Ramps Phase 4 Project on Various Highwayss (Rt. No. OR62, OR66, & OR99) beginning in Eagle Point. ($ 2,000,000 - $ 5,000,000). Req. approx. 1,385 ft2 temp signs; 3 ea seq arr sign; 2 ea PCMS; 1,900 hrs flag; 8 ea flag sta light; 2 ea TMA; 5 ea temp traf sig; 650 ft PCD; 24 ea temp curb ramp; 1,880 ft2 temp walks; 50 ft sed fence; 26 ea inlet prot; 490 ft sed barr; const surv wrk; 5,300 ft sawcut; 1 ea conc MH; 3 ea conc inlet; 4 ea adj box; 16 ea adj inlet; 6 ea adj MH; 2,000 ton aggr base; 900 ton ACP; 690 ft2 asph sl pav; 13,000 ft2 pvmt rep; 3,200 ft conc curbs; 110 ft2 conc island; 17,450 ft2 conc walks; 1,000 ft2 trunc domes; 1,430 ft thermo striping; 12 ea xwalk clos; rem & reinstall extg signs; 60 fbm wood sign post; 0.3 yd3 conc in sign sup; 253 lb st in sign sup; 36 ft2 signs; 9 ea traf sig mod; 2 ea flash beac install; 0.1 acre seeding; 60 yd3 topsoil; 5 yd3 bark mulch; 3 ton rk mulch; 190 ft2 weed ctrl geot. Class Of Work: Miscellaneous Highway Appurtenances. The policy of the Oregon Department of Transportation is to provide equal opportunity for participation in its contracting activities to all persons and firms in compliance with applicable Federal and State laws, rules and regulations. The Department of Transportation may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the Department of Transportation that it is in the public interest to do so. To be eligible for award of Oregon Department of Transportation construction contracts, bidders (prime contractors) must submit a prequalification application according to ODOT's Oregon Administrative Rules and prequalification procedures at least ten calendar days before the Bid Closing date. Prequalification must be in the class(es) of work indicated in the project's special provisions, and the bid booklet. ORDOT - 003 - Jackson County Curb Ramps Phase 4 Project *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

Roads / Highways

$5,000,000.00

Public - State/Provincial

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
17
Bidding Soon
235
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2026

February 15, 2027

Project location map

Multiple Locations, Medford, OR

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed