BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 25, 2026 at 8:00 PM

Updated May 16, 2026

Site work and paving for a road / highway in Parker, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Reference Number 0000417355 Source ID PU.AG.USA.1266.C11686526 Piggyback Contract No The project consists of improvements to four Jordan Road intersections at Pine Lane, Wintergreen Parkway, Recreation Drive, and Todd Drive. The scope of the work consists of but not limited to hot mix asphalt patching (200 ton), hot mix asphalt (700 ton), removal of asphalt mat (600), and aggregate base course (190 CY). In addition, the associated project pavement markings, traffic and erosion control. Question Deadline 04/06/2026 at 12:00 PM MT Questions are submitted online No Questions are submitted online No All bidders questions and inquiries shall be directed to the Town of Parker's Project Manager, Tom Gill, Tom Gill tgill@parkerco.gov Office Phone: (303) 805-3190 20120 East Mainstreet Parker, Colorado 80138 General Requirements - Bid Deposit Required - Insurance Required Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 100 % - Payment Bond 100 %

Award

Roads / Highways

Public - City

Paving, Site Work

18

6

7

Subscribe For Documents

64 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
240
Active Projects
115
Bidding Soon
1,202
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.