BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2026 at 8:00 PM

Updated May 16, 2026

Renovation of a municipal facility in Whittier, California. Completed plans call for the renovation of a municipal facility.

The work consists of the decommissioning and removal of Air Handler Unit (AHU) No. 3 located in the building basement mechanical room, and replacing it with a new AHU in place, including modifications to the ductwork, electrical equipment, instrumentation, piping, and control system. Additional work includes replacement of the control valves for AHU 1 and 2 on the roof with pressure independent control valves, and the addition of a differential pressure control valve for the first floor cafeteria zone, and all appurtenant work.All bids must be fully transmitted by the date and time specified . Question Deadline 05/12/2026 Questions concerning the project, plans, and specifications, will ONLY be received and accepted via the online electronic Q&A feature through online. The last day for submitting questions to the district will be close of business 5 working days prior to the bid opening date. Each bid shall be submitted electronically online and must be accompanied by a certified check, cashier's check, or bid bond with an approved surety company as surety, payable to Los Angeles County Sanitation District No. 2 or other authorized security provided by Public Contract Code 20784, for an amount equal to at least ten percent of the amount bid as a guaranty that the bidder, if successful, will enter into a contract satisfactory to the Board of Directors for completing the work contemplated. The successful bidder must file good and sufficient bonds for the faithful performance of the contract and for the payment of laborers and materialmen. Bonds for the faithful performance of the contract and for the payment of laborers and materialmen that are issued by sureties that are listed in the latest version of the U.S. Department of Treasury Circular 570 and that are authorized to issue bonds in the State of California, and whose bonding limitation shown in the circular is sufficient to provide bonds in the amount of the contract, will be deemed approved unless specifically rejected. At the time of bid, the Contractor shall possess a valid California Contractor's License in one of the following classifications:GENERAL ENGINEERING "A" The Board of Directors may reject all bids. Unless all bids are rejected, award will be made to the low, responsive, responsible bidder.The work of construction must be completed within 240 WORKING DAYS after the date in the Notice to Proceed. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Sub-Bidding

Municipal

$1,800,000.00

Public - County

Renovation

55

24

11

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
573
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 19, 2026

July 20, 2026

Project location map

1955 Workman Mill Rd, Whittier, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.