BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 25, 2026 at 8:00 PM

Updated March 26, 2026

Site work for a religious / funeral development in Alton, Illinois. Working plans call for site work for a religious / funeral development.

The work consists of providing all personnel, management, supplies, transportation, equipment, and supervision necessary to perform complete section renovation for the indicated cemetery sections at Alton National Cemetery. Work includes site surveying; preparation of grading plans and headstone realignment plans; vegetation removal, grading, drainage, excavation, and backfilling; headstone identification and tagging; handling of upright headstones and flat markers; installation of a flat marker geogrid support system; reinstallation and cleaning of headstones; turf renovation within the required seasonal windows; and full site restoration. All work must comply with National Cemetery Administration standards. The contractor must complete all work, including submittals, reviews, quality control, construction activities, punch-list corrections, cleanup, invoicing, and closeout documentation within 365 calendar days from Notice to Proceed. Turf renovation is limited to April 15-June 30 and August 15-October 15, and turf must be fully established before winter. The magnitude of construction for this project is Between $100,000 and $250,000 The Contractor shall complete all work including submittals, reviews, quality control, repair/construction services, punch list corrections, clean up, invoicing and closeouts documentation submittal within Three Hundred and Sixty-Five (365) calendar days from Government issuance of the Notice to Proceed. Location: Alton National Cemetery, 600 Pearl Street, Alton, IL 62002. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Religious / Funeral

$250,000.00

Public - Federal

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
47
Active Projects
5
Bidding Soon
1,078
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2026

Project location map

600 Pearl St, Alton, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.