Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 25, 2026 at 8:00 PM
Updated March 26, 2026
Site work for a religious / funeral development in Alton, Illinois. Working plans call for site work for a religious / funeral development.
The work consists of providing all personnel, management, supplies, transportation, equipment, and supervision necessary to perform complete section renovation for the indicated cemetery sections at Alton National Cemetery. Work includes site surveying; preparation of grading plans and headstone realignment plans; vegetation removal, grading, drainage, excavation, and backfilling; headstone identification and tagging; handling of upright headstones and flat markers; installation of a flat marker geogrid support system; reinstallation and cleaning of headstones; turf renovation within the required seasonal windows; and full site restoration. All work must comply with National Cemetery Administration standards. The contractor must complete all work, including submittals, reviews, quality control, construction activities, punch-list corrections, cleanup, invoicing, and closeout documentation within 365 calendar days from Notice to Proceed. Turf renovation is limited to April 15-June 30 and August 15-October 15, and turf must be fully established before winter. The magnitude of construction for this project is Between $100,000 and $250,000 The Contractor shall complete all work including submittals, reviews, quality control, repair/construction services, punch list corrections, clean up, invoicing and closeouts documentation submittal within Three Hundred and Sixty-Five (365) calendar days from Government issuance of the Notice to Proceed. Location: Alton National Cemetery, 600 Pearl Street, Alton, IL 62002. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
Religious / Funeral
$250,000.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 30, 2026
600 Pearl St, Alton, IL
Related To This Project
Alton, IL
Bid Date: Mar 31 2026
Alton, IL
Bid Date: Mar 04 2026
Alton, IL
Bid Date: Mar 04 2026
Alton, IL
Bid Date: Feb 05 2026
Alton, IL
Bid Date: Feb 05 2026
Alton, IL
Bid Date: Mar 11 2026
Alton, IL
Bid Date: Feb 17 2026
Alton, IL
Bid Date: Feb 06 2026
Alton, IL
Bid Date: Jan 21 2026
Alton, IL
Bid Date: Jan 21 2026
Alton, IL
Bid Date: Jan 06 2026
Alton, IL
--
Alton, IL
Bid Date: Nov 10 2025
Alton, IL
Bid Date: Oct 23 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
