BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 7, 2026 at 8:00 PM

Updated May 20, 2026

Site work, paving and outdoor lighting for a mixed-use development in Fremont, Nebraska. Completed plans call for site work for a transportation facility; for outdoor lighting for a transportation facility; for paving for a transportation facility; and water / sewer project.

For furnishing all labor, materials and equipment and performing all work necessary to: Reconstruct Parallel Taxiway (3,240' x 35'), Taxiway B Extension and Electrical Improvements. In general, this work will require the following approximate quantities: Embankment in Place (7,634 CY); Pavement Removal (15,030 SY); 9" Cement Treated Subgrade (19,120 SY); 6" Aggregate Base Course (18,195 SY); 7.5" Concrete Pavement (17,270 SY); 24" Class IV Reinforced Concrete Arch Pipe (304 LF); 4" Perforated Underdrain Pipe (6,400 LF); Airfield Lighting; REILs; Pavement Marking; Seeding; Bonded Fiber Matrix Contractors bidding shall be pre-qualified by NDOT to construct CONCRETE PAVEMENT or as "General", as required by the Notice to Bidders. This project is subject to the requirements of 49 CFR Part 26 Disadvantaged Business Enterprise Participation. The Airport Sponsor has established a contract participation goal of 0.0% for small business concerns owned and controlled by certified disadvantaged business enterprises (DBE). The Owner's award of this contract is conditioned upon the bidder satisfying the good faith effort requirements of 49 CFR 26.53. Questions regarding bids shall be directed to Heather Olson, P.E. at 402.938.2460 or 402.202.4980.

Award

Transportation Terminals

$3,130,133.00

Public - City

Outdoor Lighting, Paving, Site Work

82

14

2

7

Subscribe For Documents

48 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
134
Active Projects
77
Bidding Soon
1,007
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2026

July 1, 2026

Project location map

1777 W 23rd St, Fremont, NE

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.