BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 11, 2026 at 8:00 PM

Updated May 16, 2026

Site work for a water / sewer project in Campbellton, Florida. Completed plans call for site work for a water / sewer project.

Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: David H. Melvin Consulting Engineers 4428 Lafayette Street, Marianna, Florida, 32446 (850) 482-3045 / destineewiggins@melvineng.com Question Deadline 04/08/2026 LOCATION OF WORK The Work under this Contract is located at the existing Well #4 municipal water supply well site located east of the Campbellton Park 5147 Highway 231, Campbellton, FL 32426 1.2 WORK TO BE DONE A. The Contractor shall furnish all labor, tools, services and incidentals to complete all work required by these Contract Documents. B. The Contractor shall perform the work complete, in place, disinfected where applicable and ready for continuous service, and shall include repairs, replacements and restoration required as a result of damages caused during this construction. C. Furnish and install all materials, equipment and labor which is reasonably and properly inferable and necessary for the proper completion of the work, whether specifically indicated in the Contract Documents or not. 1.3 GENERAL DESCRIPTION OF CONTRACT The Work generally consists of removal of the existing vertical turbine well pump assembly, motor, right-angle gear drive, flexible coupling, and associated appurtenances and furnishing and installation of a new vertical turbine well pump assembly including pump bowls, column pipe, shafting, discharge head, motor, right-angle gear drive, flexible coupling, and associated appurtenances. The Work also includes removal of existing above-ground piping and installation of new 6-inch above-ground ductile iron piping, valves, fittings, and appurtenances. Additional work includes startup, testing, disinfection, and commissioning of the pump system, including bacteriological sampling and analyses, and all other labor, materials, equipment, and incidentals required to provide a complete and operable installation as shown on the Drawings and specified herein

Bid Results

Water / Sewer

$178,355.00

Public - City

Site Work

5

14

10

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
45
Bidding Soon
540
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 22, 2026

May 22, 2026

Project location map

5147 US-231, Campbellton, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.