Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 26, 2026 at 8:00 PM
Updated March 27, 2026
Site work and paving for a mixed-use development in Huntington, Indiana. Conceptual plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; road / highway; water / sewer project; and water / sewer project.
Project Description: HMA Structural Overlay including storm sewer installation and new pedestrian trail along West Park Drive from Victory Noll Drive to 330' east of SR9/US24 Phases Included: PE, UT Coord, RW Funding: 80% federal funding for all phases The method of contractor selection has not been determined at this time. INDOT - RFP Engineering - HMA Structural Overlay Including Storm Sewer Installation and New Pedestrian Trail * Estimated Construction Amount: $5,855,253.54
Conceptual
Sidewalks / Parking Lot
$5,855,254.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
