BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 26, 2026 at 8:00 PM

Updated March 27, 2026

Site work and paving for a mixed-use development in Huntington, Indiana. Conceptual plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; road / highway; water / sewer project; and water / sewer project.

Project Description: HMA Structural Overlay including storm sewer installation and new pedestrian trail along West Park Drive from Victory Noll Drive to 330' east of SR9/US24 Phases Included: PE, UT Coord, RW Funding: 80% federal funding for all phases The method of contractor selection has not been determined at this time. INDOT - RFP Engineering - HMA Structural Overlay Including Storm Sewer Installation and New Pedestrian Trail * Estimated Construction Amount: $5,855,253.54

Conceptual

Sidewalks / Parking Lot

$5,855,254.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
4
Bidding Soon
804
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2027

Project location map

W Park Dr, Huntington, IN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.