BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 19, 2026 at 8:00 PM

Updated May 21, 2026

Site work and paving for a mixed-use development in Portage, Wisconsin. Completed plans call civil work for a road / highway, sidewalk / parking lot and water / sewer project.

The work includes approximately 2,450 lineal feet of 8-inch ductile iron water main with all appurtenances, fittings, and services; approximately 2,400 lineal feet of 8-inch PVC SDR 35 sanitary sewer main with all manholes, laterals, and connections; approximately 330 lineal feet of storm sewer of various sizes and materials with all structures and connections; approximately 2,350 linear feet of roadway reconstruction including removals, intersections, concrete curb and gutter, spot repairs, concrete waterways, sidewalk spot repairs and curb ramps, dense graded base, 4-inch asphaltic pavement, and epoxy pavement markings; and all other surface, grading, erosion control, traffic control, clearing and grubbing, removals, and turf restoration work. Bid Alternate A provides for replacing ductile iron water main with PVC C900 water main, 1-inch copper water services with 1-inch HDPE water services, and includes tracer wire for the water main with all appurtenances. Bid Alternate B includes installation of approximately 2,550 lineal feet of Void Reducing Asphalt Membrane (VRAM) on the longitudinal joint between binder and surface lifts of proposed asphaltic concrete pavement. Bidders must provide bid security in the amount of 5% of the maximum bid price. No bidder may withdraw their bid within 60 days after the bid opening. Minimum wages to be paid shall be in accordance with the wage rate scale established by local wage rates. The owner reserves the right to waive any informalities or to reject any or all bids. Question Deadline 04/09/2026 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Nick Manke, PE, (608) 355-8841 | nmanke@msa-ps.com

Award

Roads / Highways

$1,519,648.00

Public - City

Paving, Site Work

50

19

2

4

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
256
Active Projects
148
Bidding Soon
2,208
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2026

June 15, 2026

Project location map

E Pleasant St, Portage, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.