Published May 18, 2026 at 8:00 PM

Updated May 21, 2026

Renovation of a water / sewer project in East Palo Alto, California. Completed plans call for the renovation of a water / sewer project.

The City is soliciting proposals from qualified and experienced vendors to perform the repair and refurbishment of a 15 MVA Allis Chalmers substation transformer equipped with a TLH-21 on-load tap changer (OLTC). The existing 1967 TLH-21 OLTC is exhibiting mechanical failures that prevent proper tap changing, although initial assessments indicate that the transformer's core and coil remain electrically sound. Additional observed deficiencies include minor oil migration between the OLTC cabinet and main tank, as well as two leaking radiator valves. The selected contractor will be responsible for the complete replacement of the TLH-21 OLTC with a certified remanufactured unit, full oil handling and processing for both the OLTC and main transformer tanks, and resealing of all interfaces to eliminate oil transfer. Approximately 4,348 gallons of oil will be drained from the main tank into a contractor-provided holding tanker for later reuse, while the OLTC tank oil (approximately 760 gallons) will be drained into City-provided containers and replaced with new transformer-grade oil if necessary based on testing and condition. The scope also includes replacement of radiator valves and gaskets, removal and replacement of the 60 kV SMD fuse holder, pressure testing of the main tank, and execution of all required pre- and post-work diagnostic testing, including power factor testing, TTR, excitation, winding resistance, SFRA, DGA, and oil quality analysis. The City of Palo Alto Utilities will dispose of any transformer oil that is not intended for reuse. The objective of this project is to restore full mechanical functionality and dielectric reliability of the transformer and its OLTC system, prevent further degradation, and extend the operational service life of this critical distribution asset. Vendors with demonstrated expertise in OLTC replacement, transformer oil processing, and high-voltage diagnostic testing are encouraged to submit proposals in accordance with this IFB. Question Deadline 03/30/2026 at 1:00 PM PT Any Bidder may submit to the Contract Administrator for this IFB a written request for the clarification of any aspect of the Project Specifications or any other related information, or part thereof, which is a part of the IFB. Such request shall be submitted electronically .

Award

Water / Sewer

$286,660.00

Public - City

Renovation

4

7

5

5

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2026

July 1, 2026

Project location map

To be determined, East Palo Alto, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.