Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 8, 2026 at 8:00 PM
Updated May 16, 2026
Site work for a water / sewer project in Bellevue, Washington. Completed plans call for site work for a water / sewer project.
Work contemplated to be performed under this contract is as follows: constructing approximately 10,100 LF of ductile iron water mains; installing new fire hydrant assemblies; installing replacement water services; constructing a replacement Pressure Reducing Valve in a concrete vault; abandoning existing Pressure Reducing Valve station; construction dewatering; relocating existing utilities (as required); abandoning asbestos cement pipe; restoring surface conditions, including asphalt trench patching and concrete curbs, gutters and sidewalks; performing traffic control; and other work as required to complete the project. Each bid shall be accompanied by a bid bond in the form of cash, certified check, cashier's check or surety bond in an amount equal to at least 5% of the amount of such bid. Checks shall be made payable to the City Treasurer. Should the successful bidder fail to enter into a contract and furnish a satisfactory performance and payment bond within the time stated in the specifications, the bid bond shall be forfeited to the City of Bellevue. Supplemental Responsible Bidder Criteria will apply to this project, and are included in the Special Contract Information section, Item 17. In a timely manner, bidders may request, in writing, that the City modify the supplemental criteria. The City reserves the right to modify or not modify the supplemental criteria in its discretion. The City shall issue an addendum, prior to the Bid Due Date, should it modify the supplemental criteria. The City shall not modify the supplemental criteria after the Bid Due Date; therefore, bidders are encouraged to discuss with the project manager immediately and before the Bid Due Date the relevancy of the supplemental bidder criteria. Any bidder determined to be not responsible based on these supplemental criteria may appeal the City's determination by providing additional information to the City within two business days following receipt of the City's written determination that the bidder was determined not responsible. The City of Bellevue reserves the right to reject any and all bids and to waive irregularities and informalities in the bidding process. No bidder may withdraw their bid for a period of ninety (90) days after the date and time set for the opening thereof. The successful bidder must comply with the City of Bellevue equal opportunity requirements. The City of Bellevue is committed to a program of equal employment opportunity regardless of race, color, creed, religion, gender, age, national origin, pregnancy, genetic information, marital status, sexual orientation (including gender identity), or the presence of any sensory, physical, or mental disability. Engineers Estimate Range is $7M to $7.5M. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. For information during the bidding period, please contact the Project Engineer: Ali Sabeeh, PMP, ENV SP Utility Engineer / Project Manager City ofBellevue Utilities P.O. Box 90012 450 - 110th Ave NE, 5W Bellevue, WA 98009-9012 (425) 452-7663 Asabeeh@bellevuewa. gov
Bid Results
Water / Sewer
$5,091,400.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 9, 2026
June 8, 2026
Multiple Locations, Bellevue, WA
Related To This Project
Bellevue, WA
Bid Date: Apr 23 2026
Bellevue, WA
Bid Date: May 14 2026
Bellevue, WA
Bid Date: May 21 2026
Bellevue, WA
Bid Date: May 13 2026
Bellevue, WA
Bid Date: May 28 2026
Bellevue, WA
Bid Date: Jun 03 2026
Bellevue, WA
--
Bellevue, WA
Bid Date: Apr 23 2026
Bellevue, WA
Bid Date: Apr 02 2026
Bellevue, WA
Bid Date: Apr 07 2026
Bellevue, WA
--
Bellevue, WA
Bid Date: Apr 07 2026
Bellevue, WA
Bid Date: Apr 24 2026
Bellevue, WA
Bid Date: Mar 19 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
