BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 25, 2026 at 8:00 PM

Updated May 21, 2026

Renovation of a transportation facility in Garrison, North Dakota. Completed plans call for the renovation of a 617-square-foot transportation facility; and 382-square-foot transportation facility.

DBE 4.0 % The project shall consist of the remodel of the G.A. Terminal building at the Garrison Municipal Airport. The work will include demolition, interior and exterior construction, plumbing, electrical, HVAC, finish work, exterior sidewalk and drainage improvements, site restoration, and various other items of related construction. Question Deadline 04/17/2026 A bidder that has doubt as to the true meaning of a project requirement may submit to the Owner's Engineer a written request for interpretation no later than three (3) days prior to bid opening. Sealed bids are sought for furnishing all equipment, labor, and materials as specified, and for performing all incidental work for GA Terminal Improvements at Garrison Municipal Airport, Garrison, North Dakota. Bid Schedule A - Terminal Improvements (Federally Eligible) includes: Mobilization (max 10% of total project costs), Construction Safety Phasing Plan, and GA Terminal Improvements. Work includes, but is not limited to: Demolition, 617 sq ft metal roof panel installation, 510 sq ft exterior wall panel installation, 263 sq ft interior liner panel installation, doors, windows, miscellaneous building materials (including but not limited to metal studs, drywall, floor and ceiling finishes, insulation, and casework), electrical (see plans for work schedule breakdown), plumbing, HVAC, concrete stoop construction, fence/gate removal and replacement, 260 sq ft concrete sidewalk removal, 389 sq ft 4-inch concrete sidewalk installation, relocation of water service line, site grading, 207 sq ft rock landscaping, site restoration, and various other construction-related items. Additional information available in project plans. Bid Schedule B - Terminal Improvements (Federally Ineligible) includes: GA Terminal Improvements such as demolition, 382 sq ft metal roof panel installation, 483 sq ft exterior panel installation, 510 sq ft interior liner panel installation, 360 sq ft interior ceiling panel installation, walk door, miscellaneous building components (including but not limited to insulation), electrical (see plans for work schedule breakdown), concrete stoop construction, 148 sq ft concrete sidewalk removal, 77 sq ft 4-inch concrete sidewalk, 93 sq ft 6-inch concrete sidewalk, 83 sq ft rock landscaping, and other related construction work. Additional information available in project plans. Bids must be either mailed or hand delivered prior to the bid opening.

Bid Results

Transportation Terminals

$726,925.00

Public - City

Renovation

25

32

5

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
18
Bidding Soon
249
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 21, 2026

May 21, 2026

Project location map

Multiple Locations, Garrison, ND

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.