BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 28, 2026 at 8:00 PM

Updated May 21, 2026

Site work and paving for a road / highway in Weston, Wisconsin. Completed plans call for site work for a road / highway.

The project includes temporary erosion control and sawcutting; curb and gutter, asphalt pavement, and asphalt and concrete driveways. It involves removal and proper disposal or salvage of existing sanitary sewer and structures with castings, drinking water main, water fittings, and appurtenances, storm sewer and structures with castings, aggregate, soil, and topsoil. Work also includes installation of new PVC SDR-35 sanitary sewer and reinforced concrete structures, removal of concrete castings, ductile iron drinking water main, fittings, and valves, reinforced concrete storm sewer and reinforced concrete structures with castings, concrete sidewalk, ADA-compliant curb ramps, concrete curb and gutter, concrete driveways, roundabout construction, earthwork (grading roadway, swales, and driveways), asphalt paving, permanent signing and pavement marking, and landscape restoration. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Question Deadline 04/10/2026 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing.Isaac Dolan, PE. All questions may be submitted through the Q & A/Info selection. Bidder is required to visit the Site and conduct a thorough visual examination of the Site and adjacent areas. During the visit the Bidder must not disturb any ongoing operations at the Site.

Award

Roads / Highways

$836,619.00

Public - City

Paving, Site Work

60

24

12

4

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
78
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2026

June 16, 2026

Project location map

Jelinek Ave & Alderson St, Weston, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.