BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 21, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a road / highway in Milwaukee, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Mill and Overlay (5 Locations) for Milwaukee County Highway Department: CTH Roads: 1. W. Silver Spring Drive: Beginning approximately 250 feet west of N. 103rd Street and extending east to N. 95th Street. Work will include both the eastbound and westbound lanes. 2. W Beloit Rd: Beginning approximately 100ft west of S. Wollmer St. and extending east to S. 103rd Street. Work will include both the eastbound and westbound lanes. Parkways (Typically about 26ft wide): 3. Oak Creek Pkwy near Grant Park: Beginning at Mill Rd. in South Milwaukee and extending east just passed the Beach Road (approximately 50ft north of the trail crossing) 4. Whitnall Park Dr near Boerner Botanical Gardens: Beginning at the entrance of Whitnall Park Dr. from the Boerner Botanical Garden Parking lot extending south to the next Parkway intersection. 5. Park Dr near Greenfield Park: Beginning at Lincoln Ave and extending south approximately 175 feet before the parking lot entrance to Picnic Area 3A. Question Deadline 04/15/2026 at 10:30 AM CT Online Portal . Mill existing asphalt pavement to a uniform depth of up to 2 inches. o Construct a one-course asphalt overlay with an average compacted thickness of 2 inches using a 5MT 58-28S asphalt mix. o Apply tack coat to all milled surfaces prior to paving operations. o Provide and maintain all required traffic control during the duration of work Include all required crossovers necessary to support and maintain traffic flow during construction. o No pavement markings or striping required; all painting will be performed by MCDOT. o Schedule with dates and times of when work is expected to take place will need to be provided with all bids, since MCDOT will need to provide notice to residents, businesses, and traveling public. Same requirement for providing a schedule with time and dates for Parkways since it may require re-scheduling special events, picnic areas, and other public activities. o All work must be completed before November 1, 2026. E-mail this completed form to Bid Administrator Carsten Peterson (carsten.peterson@milwaukeecountywi.gov)

Award

Roads / Highways

$539,172.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
368
Active Projects
205
Bidding Soon
3,083
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2026

May 18, 2026

Project location map

Multiple Locations, Milwaukee, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.