BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 28, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a road / highway in Tuskegee, Alabama. Completed plans call for site work for a road / highway.

The Work included in this Contract generally consists of the Construction of a new 8-inch water main in North Church Street from the intersection of Fonville Street and North Church Street to the intersection of North Church Street and U.S. Highway 80 in Tuskegee, Alabama to include approximately 3,200 linear feet of new 8-inch PVC C900 water main, appurtenances, connections to the existing system, 30 water service renewals and seven (7) fire hydrant assemblies, approximately 7 disconnection locations from existing water main and asphalt trench cut and replacement; sidewalk and curb and gutter improvements; and approximately 7,800 square yard of asphalt milling in North Church Street asphalt and asphalt resurfacing. The Work shall be performed in phases as described on project plans and as listed here: 1. Asphalt cuts, water main installation including fire hydrants, water services, and sanitary sewer manhole installation and sewer line replacement; storm sewer improvements including earth fill in specific areas, and street cut patching should be accomplished prior to street surface milling. All the items including in this first phase of work should be accomplished in the order that most fits the required sequence (water mains before laterals) or contractor preference (water, sewer, etc.). 2. Clearing and grubbing can be accomplished any time prior to street surface milling and resurfacing. 3. Sidewalk and curb demolition and replacement should be accomplished after utility improvements, and clearing and grubbing. 4. Street milling and resurfacing should be accomplished after all other major work has been accomplished. 5. Obviously street parking stripping and curb painting should be accomplished last.

Post-Bid

Roads / Highways

$1,000,000.00

Public - City

Site Work

22

13

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
49
Bidding Soon
812
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2026

June 1, 2026

Project location map

N Church St, Tuskegee, AL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.