Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 28, 2026 at 8:00 PM
Updated May 20, 2026
Site work for a road / highway in Tuskegee, Alabama. Completed plans call for site work for a road / highway.
The Work included in this Contract generally consists of the Construction of a new 8-inch water main in North Church Street from the intersection of Fonville Street and North Church Street to the intersection of North Church Street and U.S. Highway 80 in Tuskegee, Alabama to include approximately 3,200 linear feet of new 8-inch PVC C900 water main, appurtenances, connections to the existing system, 30 water service renewals and seven (7) fire hydrant assemblies, approximately 7 disconnection locations from existing water main and asphalt trench cut and replacement; sidewalk and curb and gutter improvements; and approximately 7,800 square yard of asphalt milling in North Church Street asphalt and asphalt resurfacing. The Work shall be performed in phases as described on project plans and as listed here: 1. Asphalt cuts, water main installation including fire hydrants, water services, and sanitary sewer manhole installation and sewer line replacement; storm sewer improvements including earth fill in specific areas, and street cut patching should be accomplished prior to street surface milling. All the items including in this first phase of work should be accomplished in the order that most fits the required sequence (water mains before laterals) or contractor preference (water, sewer, etc.). 2. Clearing and grubbing can be accomplished any time prior to street surface milling and resurfacing. 3. Sidewalk and curb demolition and replacement should be accomplished after utility improvements, and clearing and grubbing. 4. Street milling and resurfacing should be accomplished after all other major work has been accomplished. 5. Obviously street parking stripping and curb painting should be accomplished last.
Post-Bid
Roads / Highways
$1,000,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 30, 2026
June 1, 2026
N Church St, Tuskegee, AL
Related To This Project
Tuskegee, AL
Bid Date: May 26 2026
Tuskegee, AL
Bid Date: Jun 09 2026
Tuskegee, AL
Bid Date: May 18 2026
Tuskegee, AL
Bid Date: Jun 17 2026
Tuskegee, AL
Bid Date: May 15 2026
Tuskegee, AL
Bid Date: May 15 2026
Tuskegee, AL
Bid Date: Jan 15 2026
Tuskegee, AL
Bid Date: Aug 15 2025
Tuskegee, AL
Bid Date: Jun 04 2025
Tuskegee, AL
--
Tuskegee, AL
--
Tuskegee, AL
--
Tuskegee, AL
Bid Date: Apr 07 2025
Tuskegee, AL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
