Published May 1, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a road / highway in Saint Cloud, Minnesota. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Project includes bituminous pavement rehabilitation at the PDCM facility including bituminous paving, crack sealing, sealcoating, pavement striping, and associated grading and restoration. A. Rehabilitate the existing pavements and construct new site improvements as identified on the construction plans and described below. Bituminous Reclaim & Repave: In the bituminous reclaim and repave areas, reclaim the identified bituminous pavements to the specified depths. Regrade and remove excess reclaim materials as necessary for placement of new bituminous pavement, match existing pavement elevations unless otherwise directed by the Engineer or as necessary to ensure positive drainage of all pavement areas. Following base aggregate grading and compaction, coordinate with the Owner's Testing Agency and Engineer to conduct a proof roll test with a fully loaded tandem axle dump truck. Upon approval of base aggregate, place and compact new bituminous pavement sections as specified. Bituminous Repairs: At designated pavement repair areas, mill and/or remove the identified pavement sections to the specified depths. At full-depth pavement repair areas, saw cut the Larson Engineering, Inc. 01 11 00-3 edges of all existing pavements to remain. Where existing base aggregate is exposed, regrade and add/remove base aggregate as necessary, then thoroughly recompact base materials in accordance with the project specifications. Thoroughly sweep all repair areas clean and apply uniform tack coat to surfaces being overlaid, including all adjacent vertical edges. Place and compact new bituminous pavements as specified. Crack Seal: Within the identified pavement areas, route, sterilize, and crack seal all pavement joints greater than 1/4 wide with a hot-applied, rubberized asphalt, in accordance with the project specifications. Sealcoating: Where indicated on the drawings, complete bituminous sealcoating in accordance with the plans and specifications. After all paving and site improvement work is complete, backfill and restore all adjacent landscaping and disturbed areas. New gravel shoulders shall be placed and compacted as detailed on the plans. New bituminous pavements shall be backfilled flush along the edges and adjacent areas re-graded as necessary to ensure positive drainage off the pavements. Restore all disturbed turf and landscape areas with new seed. Re-stripe all disturbed pavement surfaces and any existing markings as noted on the plans. Match existing colors unless otherwise noted. All new striping shall receive two coats of paint; restripe areas shall receive one coat. Furnish and install new signage per the plans and specifications. Question Deadline 04/21/2026 at 2:00 PM CT All Questions/RFIís shall be submitted in writing to the Owner and/or Engineer (Contact: Bryan Miller, bmiller@larsonengr.com

Bid Results

Roads / Highways

$198,942.00

Public - State/Provincial

Paving, Site Work

7

11

5

5

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2026

August 16, 2026

Project location map

1805 US-10, Saint Cloud, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.