BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 8, 2026 at 8:00 PM

Updated May 19, 2026

Site work and paving for a sidewalk / parking lot in Florissant, Missouri. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The City of Florissant is currently accepting bids for a sidewalk repair and replacement project focused on Portland Cement Concrete slabs. All work must be performed in full compliance with Americans with Disabilities Act standards. The majority of the project site is located within the Willow Creek subdivision. Because the existing sidewalks were damaged by tree roots, all necessary tree removal and stump grinding will be completed before any concrete work begins. Tree work is being done by separate contractor and will be completed before concrete work begins. Contract shall run for a 120 Days period, effective The contract shall run for a period of 120 days after Notice to Proceed letter is issued., with the option to renew for None additional one year contract periods if agreeable to both City and Vendor. Question Deadline 04/22/2026 at 3:00 PM CT Questions must be submitted before this time for consideration. Question Response Deadline: April 24, 2026, 5:00pm

Award

Sidewalks / Parking Lot

$144,450.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
234
Active Projects
111
Bidding Soon
1,171
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2026

May 29, 2026

Project location map

Willow Creek Estates Dr, Florissant, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.