BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 2, 2026 at 8:00 PM

Updated May 21, 2026

Site work and paving for a road / highway in Absecon, New Jersey. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The work involves addressing a sinkhole observed on Showellton Avenue at the Price Landfill Superfund site, where a soil boring associated with site investigations was performed and closed approximately 15 to 20 years ago. The sinkhole is located within the roadway near the curb line and is in the vicinity of two monitoring wells installed at the same time as the former borehole. The site is part of an active groundwater remediation system operated since 2013, which includes a groundwater extraction and treatment plant, 13 shallow extraction wells, 4 deep extraction wells, and more than 100 monitoring wells located on-site and off-site. Activities are associated with the continued control and remediation of impacted groundwater and addressing subsurface conditions related to legacy investigation infrastructure at the site. Location: Showellton Avenue near 257 Showellton Avenue, Absecon, NJ 08201. The Contractor shall furnish all necessary labor, equipment, materials, and supplies to complete the tasks identified in the following paragraphs. All work shall be conducted in a safe, secure, cost efficient, and acceptable manner. Work is to be performed commensurate with the level of effort and quality intended, with appropriately qualified quality control (QC) representation. The period of performance (POP) for this Sample is 2 years from the date of award. General Instructions: Restoration of pavement at the sinkhole in the roadway at 257 Showellton Avenue in Absecon, New Jersey. The proposed pavement restoration area extends the width of the roadway and approximately 10 feet beyond the soil borings located longitudinally up and down the roadway, as indicated on the Pavement Restoration Plan drawing. The pavement restoration includes excavating the unsuitable material and replacing with approximately 5 feet of compacted aggregate overlain by a triaxial geogrid and the standard *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Post-Bid

Roads / Highways

$100,000.00

Public - Federal

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
491
Active Projects
259
Bidding Soon
2,906
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2026

June 1, 2026

Project location map

257 Showellton Ave, Absecon, NJ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.