BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 11, 2026 at 8:00 PM

Updated May 21, 2026

Site work and new construction of a transportation facility in Prescott, Arizona. Conceptual plans call for the construction of a transportation facility; and for site work for a transportation facility.

Annoucement was amended to correct item #18 to state: 18. What impact, if any are you experiencing with respect to upcoming or expected projects Annoucement was amended to correctly number the items listed below Market Survey: The FAA is seeking interested Contractors that have the capability to design and construct two new Airport Traffic Control Towers (ATCTs). Height and cab size data for each tower is provided as follows: Prescott, AZ (PRC) Prescott Regional Airport 650 square foot, twelve-sided cab configuration Highest elevation for an occupied floor (Cab floor) will be at 5,165 feet AMSL, with an estimated height of 140 feet AGL to the Cab floor, and an estimated height of 175 feet AGL to the top of the structure (AGL measurements are based on the site's current ground elevation). The ATCT will be accompanied by a one-story base building, with an estimated area of 13,903 square feet. Mesa, AZ (FFZ) Falcon Field Airport 550 square foot, eight-sided cab configuration Highest elevation for an occupied floor (Cab floor) will be at 1,493 feet AMSL, with an estimated height of 111 feet AGL to the Cab floor, and an estimated height of 146 feet AGL to the top of the structure (AGL measurements are based on the site's current ground elevation). The ATCT will be accompanied by a one-story base building, with an estimated area of 11,725 square feet. The FAA estimates that the cost of the towers will be between $40 million - $70 million per site. Introduction: In order to assist with acquisition strategy development and to gain a better understanding of the commercial marketplace, the Federal Aviation Administration (FAA) is seeking interested sources that are capable of performing the work to design and construct two (2) Air Traffic Control Towers. The FAA plans to utilize the Design-Build project delivery method and intends to use a Firm Fixed Price (FFP) Disclaimer: This announcement is not a Screening Information Request (SIR) or a Request for Proposal (RFP). The Federal Aviation Administration (FAA) is not seeking or accepting unsolicited proposals. The responses to this market survey are intended solely for informational purposes. However, the FAA reserves the right to use the information obtained in connection with this market survey to conduct future procurement activities in support of the Brand-New Air Traffic Control initiative. This announcement should not be interpreted as a commitment or promise by the Government to enter a contract. The Government is not responsible for any costs incurred in the preparation or submission of inquiries or responses to this announcement and will not reimburse any firm for these expenses. Responses will not be returned. North American Industry Classification (NAICS) Code: The NAICS code projected for this project is 236220 Commercial and Institutional Building Construction with a size standard of $45 million. Design and construct two new Airport Traffic Control Towers using a design-build delivery method under a firm-fixed-price approach. The work includes complete facility design and construction for each site, including all permitting, temporary facilities, site clearing, investigations, earthwork, and full site infrastructure. Each project includes construction of the ATCT structure and an adjacent one-story base building, along with all conveying systems, plumbing, HVAC, fire protection, electrical systems, utility extensions, ancillary site components, and connectivity between the tower and airfield equipment. Additional work includes access roadways, parking areas, pedestrian walkways, native landscaping, security perimeter fencing, and access control systems. Design services shall include all architectural and engineering services, surveys, investigations, quality control and assurance, and preparation of final construction documents in compliance with the FAA Terminal Facilities Design Standard. Construction services include all labor, materials, furnishings, equipment, supervision, administration, and quality oversight necessary to deliver fully functional and FAA-approved facilities. The contractor shall also provide commissioning coordination and support, including testing and verification activities in coordination with a third-party commissioning agent engaged by the FAA. FAA-furnished NAS electronic equipment will be supplied, installed, and maintained by the FAA. The FAA estimates that the cost of the towers will be between $40 million - $70 million per site. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Transportation Terminals

$70,000,000.00

Public - Federal

New Construction, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
26
Bidding Soon
485
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.