BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 15, 2026 at 8:00 PM

Updated May 20, 2026

Renovation of an educational facility in North Attleboro, Massachusetts. Completed plans call for the renovation of a educational facility.

Question Deadline 04/17/2026 at 2:00 PM ET Bidders shall submit all questions regarding this bid via Online. Provide and install a complete Weil McLain 13-section steam boiler with MA-compliant safety controls. Fit existing Webster oil-fired burner to the new boiler. Include all trucking, freight, and rigging for delivery and installation. Supply and install all necessary pipe, valves, and fittings for a complete installation. Ensure integrity of the main header isolation valve to prevent steam leakage or bypass. Provide all required line and control voltage electrical work. Perform start-up, skimming, and testing for proper operation. Remove and dispose of old equipment offsite in accordance with regulations. Note: If the Town of North Attleborough requires a paid Fire Department detail during welding operations, those fees will be added directly to the final invoice. The North Attleborough School District requests sealed bids from qualified contractors for the furnishing and installation of a new steam boiler system at Community Elementary School. The scope includes removal of existing equipment, installation of a Weil McLain 13-section steam boiler with Massachusetts-compliant safety controls, integration of the existing Webster oil-fired burner, all necessary piping, valves, fittings, electrical work, rigging, and commissioning. An alternate for a dual fuel system (gas/oil) should be provided. Contractors must demonstrate proven experience with large-scale boiler installations and rigging in confined spaces, submit a detailed project plan, ensure compliance with Massachusetts safety and building codes, maintain communication with district officials, remove and properly dispose of old equipment, and deliver a fully operational, tested, and commissioned boiler system. Work must be executed promptly with no interruption to school operations, and adequate staffing, equipment, and scheduling are required to meet the specified completion dates. A site visit is recommended but not mandatory for the successful bidder.

Post-Bid

Educational

$700,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2026

May 25, 2026

Project location map

45 S Washington St, North Attleboro, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.