BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 26, 2026 at 8:00 PM

Updated May 20, 2026

Demolition, site work and new construction of an educational facility in Hebron, Connecticut. Completed plans call for the demolition of a educational facility; and educational facility.

The Board of Education is soliciting bids from responsible and qualified contractors to provide construction services for demolition of the existing loading dock and construction of a new loading dock and related improvements at RHAM High School. The Work, generally, consists of: 1. Mobilization of all necessary personnel, tools and equipment; preparation of the Project Site; temporary facilities or work practices as shown on the Drawings, as called for in the Specifications, and as required to complete the Work including, but not necessarily limited to, administrative facilities, fencing, erosion and sedimentation controls and related facilities. At the conclusion of Work restore and stabilize affected areas and fully demobilize all temporary facilities, equipment, and materials; 2. Selective Demolition: Demolish and completely remove the existing loading dock and concrete pavement as shown on the Drawings and as called for in the Specifications. Provide for the off-site removal and legal disposal of all demolition waste; 3. Loading Dock Construction: Provide for the installation of required footings, foundations, reinforcing steel, fill materials, concrete ramp and railings, concrete loading dock and concrete stairs and railings. Provide for connection to existing electrical feeds for trash compactor and powered dock leveler. Install dock equipment/appurtenances such as bumpers, powered dock leveler, and steel bollards; 4. Pavement Installation: Provide for the installation of concrete pavement at the locations indicated on the Drawings and as called for in the Specifications, including required earthwork, grading, base materials, compaction, concrete placement, finishing and curing, and pavement markings; 5. Wall Restoration: Provide for the restoration of concrete and brick walls including inspection, cleaning, selective brick replacement, re-pointing, parging and sealer installation as shown on the Drawings and as called for in the Specifications. Question Deadline 04/20/2026 at 2:00 PM ET Any questions by prospective bidders regarding this Invitation to Bid, the Instructions to Bidders, or other Bidding Documents shall be addressed, in writing, by e-mail to Michael Schlehofer, Director of Facilities at michael.schlehofer@rhamschools.org.

Post-Bid

Educational

$200,000.00

Public - County

Demolition, New Construction, Site Work

10

15

6

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,134
Active Projects
653
Bidding Soon
7,885
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2026

July 1, 2026

Project location map

85 Wall St, Hebron, CT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.